Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 7860

Received: 21/10/2021

Respondent: Nicholas Chilvers

Legally compliant? Yes

Sound? No

Duty to co-operate? No

Representation Summary:

Community engagement. Yes but how?
No confidence that CBC will get out and in the community. This consultation has only been advertised on their website. No-one much reads that. This is one of Colchester's best kept secrets. Their record of engagement poor.

Change suggested by respondent:

'serious' engagement...

Full text:

Community engagement. Yes but how?
No confidence that CBC will get out and in the community. This consultation has only been advertised on their website. No-one much reads that. This is one of Colchester's best kept secrets. Their record of engagement poor.

Object

Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 8203

Received: 11/11/2021

Respondent: Ms Tracy Fance

Legally compliant? Yes

Sound? No

Duty to co-operate? No

Representation Summary:

This has not been properly publicised.

Change suggested by respondent:

EVERY house in the area should have been informed of this plan and as many do not have use of computers etc I feel that the public have not been given the proper information.

Full text:

This has not been properly publicised.

Object

Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 8265

Received: 12/11/2021

Respondent: Mr Jeremy Hagon

Legally compliant? No

Sound? No

Duty to co-operate? Yes

Representation Summary:

As part of the proposed Masterplan which is suggested to be agreed with the Local Planning Authority prior to the submission of any planning application any such masterplan should include highways network upgrades required to handle increased volume of traffic towards Stanway and the A12 J26. This includes occupancy being subject to the delivery of a new roundabout connecting Warren Lane with Maldon Road in Stanway and improved walking and cycling routes.

Change suggested by respondent:

Masterplan should include highways network upgrades required to handle increased volume of traffic towards Stanway and the A12 J26. Occupancy must be subject to delivery of a new roundabout connecting Warren Lane with Maldon Road in Stanway and improved walking and cycling routes.

Full text:

As part of the proposed Masterplan which is suggested to be agreed with the Local Planning Authority prior to the submission of any planning application any such masterplan should include highways network upgrades required to handle increased volume of traffic towards Stanway and the A12 J26. This includes occupancy being subject to the delivery of a new roundabout connecting Warren Lane with Maldon Road in Stanway and improved walking and cycling routes.

Object

Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 8461

Received: 15/11/2021

Respondent: Jan Plummer

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Public engagement about the Wick has been inadequate to date.
The questions on the forms we were asked to fill in assumed that building will go ahead, so constricting what members of the public could say.
As an experienced and qualified public engagement expert I was present at both events, I polled people as they came out and found not one person who wanted houses built on the Wick. In fact more people were demonstrating against the plan outside.
Since those two events we have received no communications whatsoever.

Change suggested by respondent:

Remove the Wick from the plan and consult properly on what should happen to it.

Full text:

Public engagement about the Wick has been inadequate to date.
The questions on the forms we were asked to fill in assumed that building will go ahead, so constricting what members of the public could say.
As an experienced and qualified public engagement expert I was present at both events, I polled people as they came out and found not one person who wanted houses built on the Wick. In fact more people were demonstrating against the plan outside.
Since those two events we have received no communications whatsoever.

Object

Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 8500

Received: 15/11/2021

Respondent: Mrs Angela Morgan

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

I would expect all dwellings built to be using sustainable materials and insulated to have no heating requirements
And using only sustainable power eg solar and heat exchanger, green roof
A tree in every garden no hard paved driveways. Sips build.

Change suggested by respondent:

No houses should be built

Full text:

I would expect all dwellings built to be using sustainable materials and insulated to have no heating requirements
And using only sustainable power eg solar and heat exchanger, green roof
A tree in every garden no hard paved driveways. Sips build.

Object

Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 8692

Received: 17/11/2021

Respondent: Mrs Valerie Haynes

Legally compliant? Yes

Sound? No

Duty to co-operate? No

Representation Summary:

'The masterplan process should include engagement of the local community' I don't believe this has happened. Many people are unaware of any plans. There may have been something on CBC website but the majority of people would not have seen this. There should be more ways of communicating with the local and also wider community.

Change suggested by respondent:

Middlewick should be removed from the local plan.

Full text:

'The masterplan process should include engagement of the local community' I don't believe this has happened. Many people are unaware of any plans. There may have been something on CBC website but the majority of people would not have seen this. There should be more ways of communicating with the local and also wider community.

Object

Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 8716

Received: 18/11/2021

Respondent: Mr Richard Kilshaw

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Engagement with the local community for the masterplan must be more accessible than the previous, inadequate engagement at both the initial stage of the proposals for development, and at this main modification stage.
Public engagement should not be restricted to the 'local community' as the site is widely used by people from across Colchester and beyond. The term 'Local community' is ambiguous and must be determined in the local plan.
There is no requirement to support the masterplan through detailed ecological assessment prior to the submission of any planning application.

Change suggested by respondent:

Wider public consultation is required that extends across the whole of Colchester as a minimum and be more widely accessible to the public than the previous public engagement exercises.

Given the ecological significance of this site, the masterplan will be supported, as appropriate, with site wide parameter plans, design codes or design guidance, and detailed, i.e. phase 2 ecological assessment.

Full text:

Engagement with the local community for the masterplan must be more accessible than the previous, inadequate engagement at both the initial stage of the proposals for development, and at this main modification stage.
Public engagement should not be restricted to the 'local community' as the site is widely used by people from across Colchester and beyond. The term 'Local community' is ambiguous and must be determined in the local plan.
There is no requirement to support the masterplan through detailed ecological assessment prior to the submission of any planning application.

Object

Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Representation ID: 8770

Received: 18/11/2021

Respondent: enform

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

This site was added to the Local Plan without adequate consultation with local community for a site of this complexity. This modification therefore needs to be strengthened to say
The masterplan process MUST include engagement of the local community.
It is important to note that only one of the two consultations promised by the DIO, took place and a positive spin was put on the responses they received.

Change suggested by respondent:

This modification needs to be strengthened to say
The masterplan process MUST include engagement of the local community.
It is important to note that only one of the two consultations promised by the DIO, took place and a positive spin was put on the responses they received.

Full text:

This site was added to the Local Plan without adequate consultation with local community for a site of this complexity. This modification therefore needs to be strengthened to say
The masterplan process MUST include engagement of the local community.
It is important to note that only one of the two consultations promised by the DIO, took place and a positive spin was put on the responses they received.