MM48
Object
Draft Schedule of Main Modifications to Section 2 Colchester Local Plan
Representation ID: 7857
Received: 21/10/2021
Respondent: Nicholas Chilvers
Legally compliant? Yes
Sound? No
Duty to co-operate? No
Time for Highways to examine and progress a dedicated southern circular route linking Stanway with the eastern garden community. There is currently a 'hotchpotch' of roads with numerous pinch points and junctions. The matter has never been addressed and should be. The Wick development will aggravate a dire situation. Some strategic thinking is needed instead of wishful thinking that 'sustainable transport is going to be the answer. They did it in 1930's as the old bypass north of the town.
Build a dedicated southern circular road. .
Time for Highways to examine and progress a dedicated southern circular route linking Stanway with the eastern garden community. There is currently a 'hotchpotch' of roads with numerous pinch points and junctions. The matter has never been addressed and should be. The Wick development will aggravate a dire situation. Some strategic thinking is needed instead of wishful thinking that 'sustainable transport is going to be the answer. They did it in 1930's as the old bypass north of the town.