Strategic Infrastructure Policy

Showing comments and forms 1 to 3 of 3

Comment

Preferred Options Local Plan

Representation ID: 260

Received: 19/08/2016

Respondent: Mr Simon Hall

Representation Summary:

4.56 It is difficult to see how the Local Plan can be settled without a settled Infrastructure Delivery Plan which itself will turn on the critical decisions relating to the A120/A12 link which are not due until 2018

Full text:

4.56 It is difficult to see how the Local Plan can be settled without a settled Infrastructure Delivery Plan which itself will turn on the critical decisions relating to the A120/A12 link which are not due until 2018

Comment

Preferred Options Local Plan

Representation ID: 1427

Received: 14/09/2016

Respondent: NOEL MEAD

Representation Summary:

I note that in the absence of proven infrastructure capacity, policy will prevent development from being commenced or permitted (4.59).There is no current Infrastructure Delivery Plan, so that capacity cannot be determined.
Amongst other things, there is no plans for new hospital capacity, but existing capacity is already over- stretched.

Full text:

I note that in the absence of proven infrastructure capacity, policy will prevent development from being commenced or permitted (4.59).There is no current Infrastructure Delivery Plan, so that capacity cannot be determined.
Amongst other things, there is no plans for new hospital capacity, but existing capacity is already over- stretched.

Support

Preferred Options Local Plan

Representation ID: 2130

Received: 16/09/2016

Respondent: Cllr rosalind scott

Representation Summary:

The detail of the IDP will decide whether residents are prepared to support new developmnents

Full text:

The detail of the IDP will decide whether residents are prepared to support new developmnents