Object
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11218
Received: 05/12/2025
Respondent: Mr Keith Horton
REDACTED
REDACTED
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11293
Received: 09/12/2025
Respondent: Mr Community Campaigner David Barton
Representations are being made with a view to supporting economic growth through the merits of High-Quality style Conservation with the hope of encouraging wider constructive and restorative support through positive and constructive working. It is submitted that TVA should play a key part in any and all policy moving forwards on the grounds of conferring practical benefits be these periodic maintenance, their perceived support from the public, their invaluable contribution to achieving Climate Crisis Targets set local, nationally and internationally alongside their overall cost-effectiveness to key stakeholders alike in terms of Planning and sourcing of raw materials.
as previous
Support
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11775
Received: 02/01/2026
Respondent: Mr. Graham Barney
Whilst the principle of providing this type of housing is good, there is no evidence that in PP29 or PP17 that housing for an aging population will be provided.
Whilst the principle of providing this type of housing is good, there is no evidence that in PP29 or PP17 that housing for an aging population will be provided.
Support
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 12006
Received: 06/01/2026
Respondent: Mrs Amanda Hursey
These need to be affordable
These need to be affordable
Support
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 12757
Received: 12/01/2026
Respondent: West Bergholt Parish Council
West Bergholt Parish Council supports this policy, as evidenced see attached West Bergholt’s Housing Needs Survey, November 2025.
West Bergholt Parish Council supports this policy, as evidenced see attached West Bergholt’s Housing Needs Survey, November 2025.
Object
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 12959
Received: 12/01/2026
Respondent: Mrs Eleanor Jenkins
There does not seem to be much provision for sheltered housing for adults with issues, or for care leavers, or older people to be supported while living independently yet I note that large developments should be demonstrating the provision for each estate.
There does not seem to be much provision for sheltered housing for adults with issues, or for care leavers, or older people to be supported while living independently yet I note that large developments should be demonstrating the provision for each estate.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13044
Received: 13/01/2026
Respondent: East Suffolk & North Essex NHS Trust
Comments made by the following:
SNEEICB
EEAST
Health Response reference page 16
There are possible locations that could accommodate more specialist accommodation than others and working together to identify these areas could be a useful way of trying to mitigate the impacts on PCNs going forward.
Care homes (including Extra Care and other Older People’s accommodation) should not be built in Flood Zone 2 or 3 areas unless effective flood proofing and evacuation plans which do not involve emergency services are in place.
P101
The ICB understands the need for new care facilities and facilities for an aging population and is supportive of this policy in general. The ICB is keen for CCC and all LPAs to understand the impact care facilities have on primary care services due to the way in which patient appointments are made within that setting. Primary care services spend multiple hours per week attending the various care homes within their respective Primary Care Networks (PCNs) seeing patients and this can’t be mitigated through usual physical infrastructure increases via s106. This results in more appointments being done away from the surgery and less availability in the surgeries for standard appointments.
There are possible locations that could accommodate more specialist accommodation than others and working together to identify these areas could be a useful way of trying to mitigate the impacts on PCNs going forward.
Care homes (including Extra Care and other Older People’s accommodation) should not be built in Flood Zone 2 or 3 areas unless effective flood proofing and evacuation plans which do not involve emergency services are in place.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13446
Received: 14/01/2026
Respondent: Stanfords
Stanfords Colchester LLP has submitted detailed representations on this draft policy; please refer to the attached document.
Amend the policy to recognise neurodiversity as a key consideration in specialist and supported housing. This should include individuals with autism, ADHD, and
other cognitive or sensory differences who may require tailored environments.
Incorporate requirements for sensory-friendly design features
Cross-reference national guidance such as BS 8300 (Design of buildings for accessibility and inclusion).
Require housing needs assessments to include data on neurodivergent populations and their specific requirements, ensuring provision aligns with
local demographics.
Stanfords Colchester LLP has submitted detailed representations on this draft policy; please refer to the attached document.
Object
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13626
Received: 14/01/2026
Respondent: Anchor Hanover
Anchor Hanover supports a dedicated policy for older persons’ housing, including a delivery target to meet growing need. However, we oppose stricter criteria than for general needs housing, which may restrict delivery. Anchor welcomes the requirements for provision in large schemes, but stress policies must reflect viability, with specialist housing usually needing at least 65 homes on one site.
Anchor Hanover, England’s largest provider of specialist housing and care for older people, supports the inclusion of a specific policy on older persons’ housing and one that supports all types of housing for older people. Given the significant and growing need, the policy should also include a clear numerical delivery target to ensure needs are met over the plan period.
We are concerned that the proposed policy applies stricter criteria to older persons’ housing than to general needs housing, which could limit delivery despite strong evidence of need. These criteria should therefore be removed to ensure the policy is effective and supports delivery.
We welcome the requirement for developments of 500+ homes to include provision for older people. The policy should take account of the minimum viable scale for specialist older persons’ housing, which in Anchor’s experience is at least 65 units.
Object
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13660
Received: 14/01/2026
Respondent: NEEB Holdings Ltd
Agent: Popham Planning Consultants
This policy cannot deliver the amount of specialist housing that Colchester needs.
Instead allow specialist housing to be built outside but well related to settlement boundaries of Growth and Opportunity Areas, Large Settlements and Medium settlements. An example of this is the Neighbourhood Plan for Thurston, Suffolk (Policy 1: Thurston Spatial Strategy).
In addition the plan should make allocations specifically for specialist housing (as the alternative strategy suggests) which will give certainty about the delivery of a minimum level of specialist housing.
These allocations should include Land north of Colchester Road and east of Maltings Park Road, West Bergholt.
The Council’s Local Housing Needs Assessment (Paragraph 8.28) shows that the Colchester City area has a severe shortage of specialist accommodation. However, noting the significant national need for such provision even this may be an underestimate.
Considering the severe shortage of specialist housing and care in the Colchester City area this policy doesn’t do enough to increase the amount of specialist housing and care provision in Colchester. The plan’s approach to meeting the area’s housing need is heavily skewed towards standard/non-specialist housing.
Requiring specialist housing to be located within settlement boundaries, or limiting the requirement to deliver specialist housing to schemes of over 500 dwellings within the Colchester Urban area can never deliver the level of specialist housing that is required to meet current, let alone future levels of need for specialist older people’s housing and care.
The kind of approach that is required to prevent continued and exacerbated specialist housing need in the Colchester City area is allowing specialist housing to be built outside but well related to (in most cases adjacent to) settlement boundaries of Growth and Opportunity Areas, Large Settlements and Medium Settlements. An example of such an approach can be found in the neighbourhood plan for Thurston, Suffolk (Policy 1: Thurston Spatial Strategy).
In addition, the plan should make allocations specifically for specialist housing (as the alternative strategy suggests). This will give certainty about the delivery of a minimum level of specialist housing. Contrary to what is stated this need not prevent specialist housing being delivered in a range of locations unless an illogical approach to allocation is taken AND because allocating sites for only part of the need would still allow other sites to come forward in a range of locations in line with need/demand through our proposed “well related to settlement boundaries” provision.
Proposed change(s):
The part of the policy that currently reads:
b. located within settlements;
should be replaced with:
b. well located in relation to settlement boundaries of Growth and Opportunity Areas, Large Settlements or Medium Settlements;
The following text should then be added to the policy:
Proposals for specialist older people’s housing and care will be permitted on land adjacent to but outside of settlement boundaries provided they comply with other relevant policies in this plan.
The following text should also be added:
In order to guarantee provision of specialist older people’s housing and care, this plan will allocate specific sites for such uses.
Suitable allocations for specialist older people’s housing and care should then be included within this policy or within Policy ST5. These allocations should include Land north of Colchester Road and east of Maltings Park Road, West Bergholt (site submitted: 7 March 2025 by NEEB Holdings Ltd, grid reference: TL 96887 27560, site area: 2.5 hectares). Detailed site assessment work shows that this site could deliver:
• 40 – 75 older people’s dwellings and more than 40% open space; or
• a 65 bed care home, 20 older people’s dwellings and more than 40% open space.
Object
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13715
Received: 14/01/2026
Respondent: House Builders Federation
HBF welcomes support for specialist accommodation but urges the Council to identify dedicated sites for such development rather than relying on schemes of 50+ dwellings. Collaboration with developers and specialist providers is essential to secure appropriate locations. Regarding the requirement for 5% of market homes and 10% of affordable homes to meet Part M4(3) standards, HBF notes the Council’s assessment is based on wheelchair use both inside and outside the home, overstating demand. Only 0.7% of owner-occupiers use a wheelchair indoors and outdoors. HBF recommends reassessing evidence to reflect actual need for homes built to Part M4(3).
While HBF welcomes the support for the provision of specialist accommodation the Council should be seeking to identify sites that support such development rather than rely on sites of 50 dwellings or more to provide such development. The Council needs to engage with the developers and providers and specialist accommodation and work with them to identify appropriate sites rather than rely on more speculative approaches to meeting the needs of older people.
With regard to the requirement for 5% of market homes to and 10% of affordable homes to be built to part M4(3) of the building regulations it is notable that the council have chosen to base their assessment of need on data relating to individuals who use a wheelchair both inside and outside the home rather than just those who use a wheelchair inside the home and who will require it to be built to part M4(3). The figures are quite different with only 0.7% of owner occupier using a wheelchair both inside and outside the home. While HBF recognise the need for some home to be built to part M4(3) where required there is a danger that the council’s assessment over estimates the demand for such homes. HBF would suggest the council reconsider the evidence and examine need on the basis of those who use a wheelchair inside the home.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14109
Received: 14/01/2026
Respondent: Emergency Services Collaboration Police Lead
It should be recognised that the DOCO can influence the design of specialist housing (such
as Retirement accommodation) and that Secured By Design can be adapted to ensure that
all homes within the district are designed to be safe and secure.
See full text of the attachment for each policy which in some cases add extra information that couldn't be included fully in the rep summary.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14218
Received: 14/01/2026
Respondent: Environment Agency
We are aware that there are a high number of change of use type applications
coming forward within the Colchester Local Plan area, including as change of use to
major scale care home developments and so we recommend consideration of a
separate change of use policy.
Alternatively, if you prefer to keep change of use policy references embedded within
multiple relevant policies, our comments below could be captured as a sub section to
any future bespoke Waste Water Policy, to consolidate waste water related policy
wording in one location.
see attached