Draft Schedule of Main Modifications to Section 2 Colchester Local Plan

Ended on the 18 November 2021
If you are having trouble using the system, please try our help guide.

Appendix 2 Proposed modifications to Table SG3: Colchester Employment Land Supply 2017-2033

 

Location / Allocations

Site area (ha.)

Office

(B1 a/b) sqm

Industrial (B1c/2/8) sqm

Total

sqm

Strategic Economic Areas (SEAs)

North Colchester

10.4

56,696

0

56,696

Stanway

15.6 1.4

20,506 0

42,054 5,600

62,560 5,600

Knowledge Gateway

7.0

22,538

0

22,538

Local Economic Areas (LEAs)

Colchester Town Centre

Town Centre Core

0.7

3,160

0

3,160

Edge of Centre

3.5

0

13,959

13,959

District Centres (outside Colchester)

1.5

3,078

3,078

6,156

Other Rural Areas

1.0 4.0

2,000

2,000 14,000

4,000 16,000

Total SEAs and LEAs

39.7 28.5

87,472

107,978

36,637

61,091

124,109

169,069

Garden Communities Employment Areas (GCEAs)

Colchester Braintree Borders GC

1.7

6,858

0

6,858

Tendring Colchester Borders GC

2.8 3.5

11,276 TBD

0 TBD

11,276 TBD

Total GCEAs

4.5

18,134

0

18,134

Total all allocations

44.2 32

126,112

61,091

187,203


 

 

If you are having trouble using the system, please try our help guide.
back to top back to top