(5) 8. Cross Boundary Garden Communities

8.1 A key element of the spatial growth strategy for North Essex is the development of new sustainable garden communities.

8.2 Garden communities were amongst a range of options which were considered by the local authorities to deliver their housing and employment needs. A number of sites of sufficient scale to accommodate a garden community were identified through the Call for Sites, the Strategic Land Availability Assessment (SLAA) and wider evidence gathering processes by each of the local authorities. All these options were evaluated and the assessments can be seen as part of the Sustainability Appraisal.

8.3 An Appropriate Assessment has also been completed to consider the effects of proposals in Section 1 on the integrity of the European sites either alone or in combination with other plans and projects.  At the Screening Stage the likely significant effects on European Sites, either alone or in combination with other plan and projects, were loss of offsite habitat, recreational impacts and water quality. These issues were further considered through the Appropriate Assessment.

8.4 Loss of off-site habitat - To mitigate for the loss of off-site habitat, the Appropriate Assessment identified  the need for wintering bird surveys for the Tendring Colchester Borders Garden Community as part of any project level development proposals and masterplanning, to determine the sites individual importance for golden plover and lapwing and inform mitigation proposals and a commitment to mitigation and phasing of Tendring Colchester Borders Garden Community is required within the Section 1 Strategic Plan dependent on the findings of bird surveys. 

8.5 Recreational Impacts - To mitigate for any increase in recreational pressures at the European sites, the Appropriate Assessment recommended the production for Recreational Avoidance and Mitigation Strategies (RAMS) for the Colne& Blackwater, Stour and Orwell SPAS/Ramsar sites and Essex Estuaries SAC.

8.6 Water quality – To ensure that the water quality of the European Sites are not adversely affected by growth proposals in Section 1, the Appropriate Assessment recommended the inclusion of policy safeguards to ensure that adequate water treatment capacity exists prior to developments proceeding and a commitment that the phasing of development would not exceed water and sewage infrastructure capacity and that the necessary infrastructure upgrades would be in place prior to developments coming forward.

8.7 The three authorities are committed to implementing the recommendations in the Section 1 Appropriate Assessment and these will be further progressed through the Strategic Growth DPDs.

8.8 Due to the scale of development proposed across North Essex and the infrastructure constraints which exist in many of the existing main settlements, new garden communities were considered the most deliverable and sustainable option, providing a major long-term supply of new homes if they could be delivered to the right standards at the right time.  Locations for three new garden communities were selected based on the evidence gathered and assessments undertaken.

8.9 These new communities will accommodate a substantial amount of the housing and employment growth planned for North Essex within the plan period and beyond in a sustainable way that meets the vision and strategic objectives, and provides a quality of development and community that would not occur in the absence of a holistic approach to planning and delivery.  In the absence of commitment and a policy framework that secures the principles of garden communities development in the identified locations would not be acceptable. Other options for meeting the growth would have to be considered.

8.10 The North Essex Garden Communities will be planned new settlements that respond directly to their regional, local and individual site context and opportunities to create developments underpinned by a series of interrelated principles which are based on the Town and Country Planning Association (TCPA) Garden City Principles, adapted for the specific North Essex context as set out in the North Essex Garden Communities Charter.

8.11 At least two of the three garden communities will be cross-boundary, and continued close joint working between the authorities involved will be required to secure their successful delivery. Each of the authorities is committed to ensuring that the new garden communities are as sustainable and high quality as possible and that the infrastructure needed to support them is delivered at the right time. This will require the local authorities to work very closely with the landowners within the proposed garden community locations to develop and put in place a robust delivery mechanism that will ensure a fair and equitable distribution of the costs and land requirements needed to secure the ambitions for these garden communities and create a long term legacy appropriate to the scale of this ambition. The Councils have developed and incorporated Local Delivery Vehicles (LDV) that could be used to deliver the garden communities.  The Councils are aware of the emerging Government proposals for locally led new town development corporations that may offer an alternative means of delivery.  Other delivery models are also being considered, and an appropriate tailored approach will need to be used in relation to each community.  The Councils are confident that the LDV models viable and can deliver successful and sustainable garden communities, but will continue to explore other ways of achieving the vision that offer similar levels of confidence that the right quality of development will be delivered at the right time. The North Essex Garden Communities Charter has provided a good starting point in creating a framework for this approach.

8.12 As noted earlier in this Part 1 of the Local Plan, Uttlesford are in a separate housing market area and are therefore not formal partners in this Strategic Plan for North Essex.  There will continue to be ongoing discussions with Uttlesford regarding the extent of the garden community at West of Braintree. The Uttlesford Issues and Options Plan published in October 2015 included an area of search to the west of Braintree. Uttlesford District Council is proposing to undertake preferred options consultation on its Local Plan in the summer of 2017 and the eventual scale of the west of Braintree option may depend on the conclusions that Uttlesford reach.

8.13 The Garden Communities are located within a Minerals Safeguarding Area. In line with the Essex Minerals Local Plan, the Mineral Planning Authority requires a Minerals Resource Assessment to be undertaken to assess if the sites contain a minerals resource that would require extraction prior to development. Should the viability of extraction be proven, the mineral shall be worked in accordance with the phased delivery of the non-mineral development.

8.14 At least two of the three garden communities will be cross-boundary, and the continued close joint working between the authorities involved will be required to secure their successful delivery. Each of the authorities is committed to ensuring that the new garden communities are as sustainable and high quality as possible and that the infrastructure needed to support them is delivered at the right time. Development Plan Documents will be developed for each of the garden communities. These will set out the design, development and delivery principles of each new community based on the principles set out in SP7 'Development and Delivery of New Garden Communities in North Essex' as well as the mechanism for attributing house completions to the local planning authorities' housing targets.

8.15 Based on the partnership wording between the North Essex authorities to date and their continuing commitment to the projects, each of the three proposed garden communities is planned to deliver 2,500 dwellings during the Local Plan to 2033. Delivery of 2,500 dwellings in the cross-border garden communities, no matter where they are physically built, within the Local Plan period to 2033 will be attributed as set out in section 2 of each of the individual Local Plans, or if more dwellings are built then 50:50 between the two districts concerned. A detailed mechanism will be developed to attribute housing completions to the local planning authorities to deal with the possibility that fewer than 2,500 dwellings are completed in any of the communities during the plan period to 2033; it will be informed by the DPD and agreed through a Memorandum of Understanding. It will take into account a range of factors including;

  • The resources, including finance, committed to the partnership by the councils to support delivery of high quality garden communities and achieve the projected housing delivery in both districts;
  • The wider benefits of the garden communities to the districts;
  • The burdens to the infrastructure of the districts generated by communities; and
  • The proportion of the housing built in each district.


(47) Policy SP7- Development and Delivery of New Garden Communities in North Essex

The following three new garden communities are proposed in North Essex.

Tendring/Colchester Borders, a new garden community will deliver 2,500 homes within the Plan period (as part of an overall total of between 7,000-9,000 homes to be delivered beyond 2033)

Colchester/Braintree Borders, a new garden community will deliver 2,500 within the Plan period (as part of an overall total of between 15,000 – 24,000 homes to be delivered beyond 2033)

West of Braintree in Braintree DC, a new garden community will deliver 2,500 homes within the Plan period (as part of an overall total of between 7,000- 10,000 homes to be delivered beyond 2033)

Each of these will be an holistically and comprehensively planned new community with a distinct identity that responds directly to its context and is of sufficient scale to incorporate a range of homes, employment, education & community facilities, green space and other uses to enable residents to meet the majority of their day-to-day needs, reducing the need for outward commuting. Delivery of each new community will be phased and underpinned by a comprehensive package of infrastructure.

The Councils will need to be confident, before any consent is granted, that the following requirements have been secured either in the form of appropriate public ownership, planning agreements and obligations and, if necessary a local infrastructure tariff.

The design, development and phased delivery of each new garden community will conform with the following principles:

(i) Community and stakeholder empowerment in the design and delivery of each garden community from the outset and a long-term community engagement and activation strategy.

(ii) The public sector working pro-actively and collaboratively with the private sector to design, and bring forward these garden communities, deploying new models of delivery, sharing risk and reward and ensuring that the cost of achieving the following is borne by landowners and those promoting the developments: (a) securing a high-quality of place-making, (b) ensuring the timely delivery of both on-site and off-site infrastructure required to address the impact of these new communities, and (c) providing and funding a mechanism for future stewardship, management, maintenance and renewal of community infrastructure and assets.  Given the scale of and time period for development of these new garden communities, the appropriate model of delivery will secure a comprehensive approach to the delivery of each new community in order to achieve the outcomes outlined above, avoid a piecemeal approach to development, provide the funding and phasing of both development and infrastructure, and be sustainable and accountable in the long term.

(iii) Promotion and execution of the highest quality of planning, design and management of the built and public realm so that the Garden Communities are characterised as distinctive places that capitalise on local assets and establish environments that promote health, happiness and well-being. This will involve developing a cascade of design guidance including concept frameworks, detailed masterplans and design codes and other guidance in place to inform and guide development proposals and planning applications. Planning applications and any local development orders or other consenting mechanisms for the garden communities will be expected to be consistent with approved design guidance.

(iv) Sequencing of development and infrastructure provision (both on-site and off-site) to ensure that the latter is provided ahead of or in tandem with the development it supports to address the impacts of the new garden communities,  meet the needs of residents and establish sustainable travel patterns.

(v) Development that provides for a truly balanced and inclusive community and meets the housing needs of local people including a mix of dwelling sizes, tenures and types including provision for self- and custom-built homes and provision for the aging population;  to meet the requirements of those most in need including 30% affordable housing in each garden community.

(vi) Provide and promote opportunities for employment within each new community and within sustainable commuting distance of it.

(vii) Plan the new communities around a step change in integrated and sustainable transport systems for the North Essex area that put walking, cycling and rapid public transit networks and connections at the heart of growth in the area, encouraging and incentivising more sustainable active travel patterns.

(viii) Structure the new communities to create sociable, vibrant and walkable neighbourhoods with equality of access for all to a range of community services and facilities including health, education, retail, culture, community meeting spaces, multi-functional open space, sports and leisure facilities.

(ix) Develop specific garden community parking approaches and standards that help promote the use of sustainable transport and make efficient use of land.

(x) Create distinctive environments which relate to the surrounding environment and that celebrate natural and historic environments and systems, utilise a multi-functional green-grid to create significant networks of new green infrastructure including new country parks at each garden community, provide a high degree of connectivity to existing corridors and networks and enhance biodiversity.

(xi) Secure a smart and sustainable approach that fosters climate resilience and a 21st century environment in the design and construction of each garden community to secure net gains in local biodiversity, highest standards of energy efficiency and innovation in technology to reduce impact of climate change, water efficiency (with the aim of being water neutral in areas of serious water stress), and sustainable waste and mineral management.

(xii) Ensure that the costs and benefits of developing a garden community are shared by all landowners, with appropriate measures being put in place to equalise the costs and land contributions.

(xiii) Consideration of potential on-site mineral resources through a Minerals Resource Assessment as required by the Minerals Planning Authority.

(xiv) Establishment at an early stage in the development of the garden communities, of appropriate and sustainable long-term governance and stewardship arrangements for community assets including green space, public realm areas and community and other relevant facilities; such arrangements to be funded by the developments and include community representation to ensure residents have a stake in the long term development, stewardship and management of their community.

These principles are elaborated upon in the North Essex Garden Community Charter.

A Development Plan Document will be developed for each of the garden communities to set out the principles of their design, development and phasing as well as a mechanism to appropriately distribute housing completions to the three Councils and this will be agreed through a Memorandum of Understanding.


8.16 The following three policies relate to each of the new garden communities.

(48) Policy SP8 - Tendring/Colchester Borders Garden Community

The adopted policies map identifies the broad location for the development of a new garden community of which the details and final number of homes will be set out in a Strategic Growth Development Plan Document to be prepared jointly between Colchester BC and Tendring DC and which will incorporate around 2,500 dwellings within the Plan period (as part of an overall total of between 7,000-9,000 homes) and provision for Gypsy and Travellers.

The Strategic Growth DPD will set out the nature, form and boundary of the new community. The document will be produced in consultation with stakeholders and will include a concept plan showing the disposition and quantity of future land-uses, and give a three dimensional indication of the urban design and landscape parameters which will be incorporated into any future planning applications; together with a phasing and implementation strategy which sets out how the rate of development will be linked to the provision of the necessary social, physical and environmental infrastructure to ensure that the respective phases of the development do not come forward until the necessary infrastructure has been secured. The DPD will provide the framework for the subsequent development of more detailed masterplans and other design and planning guidance for the Tendring / Colchester Borders Garden Community.

The DPD and any planning application will address the following principles and requirements in the design, development and delivery of the new garden community:

A. Place-making and design quality

1. The development of a new garden community to high standards of design and layout drawing on its context and the considerable assets within its boundaries such as woodland, streams and changes in topography, as well as the opportunities afforded by the proximity of the University of Essex campus to create a new garden community that is innovative, contemporary and technologically enabled, set within a strong green framework with new neighbourhood centres at its heart. It will be designed and developed to have its own identity and be as self-sustaining as possible recognising its location close to the edge of Colchester. It will secure appropriate integration with Colchester and the nearby University of Essex campus by the provision of suitable walking and cycling links and rapid public transport systems and connections to enable residents of the new community to have convenient access to town centre services and facilities in Colchester as well as Elmstead Market. Clear separation will be maintained between the new garden community and the nearby villages of Elmstead Market and Wivenhoe.

2. Detailed masterplans and design guidance will be put in place to inform and guide development proposals and planning applications. Planning applications for this garden community will be expected to be consistent with approved DPDs and subsequent masterplans and design and planning guidance.

B. Housing

3. A mix of housing types and tenures including self- and custom-build and starter homes will be provided on the site, including a minimum of 30% affordable housing. The affordable housing will be phased through the development;

4. New residential development will seek to achieve appropriate densities which reflect both context, place-making aspirations and opportunities for increased levels of development around neighbourhood centres and transport hubs.

C. Employment and Jobs

5. Provision for a wide range of job, skills and training opportunities will be created in the garden community. This may include B1 and/or non B class employment generating uses towards the south of the site in proximity to the existing University of Essex and Knowledge Gateway and provision for B1, B2 and B8 businesses to the north of the site close to the A120;  

6. High speed and reliable broadband will be provided and homes will include specific spaces to enable working from home.

D. Transportation

7. A package of measures will be introduced to encourage smarter transport choices to meet the needs of the new community and maximise the opportunities for sustainable travel including the provision of a network of footpaths, cycleways and bridleways to enhance permeability within the site and to access and to access the adjoining areas; development of a public rapid transit system connecting the garden community to Essex University and Colchester town centre; park and ride facilities and other  effective integrated measures to mitigate the transport impacts of the proposed development on the strategic and local road network. Longer term transport interventions will need to be carefully designed to minimise the impacts on the strategic and local road network and fully mitigate any environmental or traffic impacts arising from the development. These shall include bus (or other public transit provisions) priority measures between the site, University of Essex, Hythe station and Colchester Town Centre;

8. Foot and cycle ways shall be provided throughout the development and connecting with the surrounding urban areas  and countryside, including seamlessly linking key development areas to the University of Essex, Hythe station and Colchester Town Centre;

9. Primary vehicular access to the site will be provided off the A120 and A133;

10. Other specific transport-related infrastructure requirements identified through the Strategic Growth Development Plan Document and masterplans for this garden community will be delivered in a phased manner.

E. Community Infrastructure

11. District and neighbourhood centres of an appropriate scale will be provided to serve the proposed development. The centres will be located where they will be easily accessible by walking, cycling and public transit to the majority of residents in the garden community;

12. Community meeting places will be provided within the local centres;

13.      Primary healthcare facilities will be provided to serve the new development;

14. A secondary school, primary schools and early-years facilities will be provided to serve the new development;

15. A network of multi-functional green infrastructure will be provided within the garden community incorporating key elements of the existing green assets within the site. It will include community parks, allotments, a new country park, the provision of sports areas with associated facilities; and play facilities;

16. Indoor leisure and sports facilities will be provided with the new community, or contributions made to the improvement of off-site leisure facilities to serve the new development.

F Other Requirements

17. Provision of improvements to waste water treatment including an upgrade to the Colchester Waste Water Treatment Plant and off-site drainage improvements;

18. Provision, management and on-going maintenance of sustainable surface water drainage measures to manage and mitigate the risk of flooding on site and which will reduce the risk of flooding to areas downstream or upstream of the development;

19. Landscape buffers between the site and existing development in Colchester, Wivenhoe and Elmstead Market;

20. Protection and/or enhancement of heritage and biodiversity assets within and surrounding the site;

21. Provision of appropriate buffers along strategic road and rail infrastructure to protect new development;

22. Provision of appropriate design and infrastructure that incorporates the highest standards of innovation in energy efficiency and technology to reduce impact of climate change, water efficiency (with the aim of being water neutral in areas of serious water stress), and sustainable waste / recycling management facilities;

23. Measures to support the development of the new community including provision of community development support workers (or other provision) for a minimum of ten years from initial occupation of the first homes and appropriate community governance structures;

24. Establishment at an early stage in the development of the garden community, of appropriate and sustainable long-term governance and stewardship arrangements for community assets including green space, public realm areas and community and other relevant facilities; such arrangements to be funded by the development and include community representation to ensure residents have a stake in the long term development, stewardship and management of their community.


(80) Policy SP9 - Colchester/Braintree Borders Garden Community

The adopted policies map identifies a strategic area for development of a new garden community of which the details and final number of homes will be set out in a Strategic Growth Development Plan Document to be prepared jointly between Colchester BC and Braintree DC and which will incorporate provision of around 2,500 dwellings within the Plan period (as part of an overall total of between 15,000 to 24,000 homes) and provision for Gypsy and Travellers.

The Strategic Growth DPD will set out the nature, form and boundary of the new community. The document will be produced in consultation with stakeholders and will include a concept plan  showing the disposition and quantity of future land-uses, and give a three dimensional indication of the urban design and landscape parameters which will be incorporated into any future planning applications; together with a phasing and implementation strategy which sets out how the rate of development will be linked to the provision of the necessary social, environmental and physical infrastructure to ensure that the respective phases of the development do not come forward until the necessary infrastructure has been secured. The DPD will provide the framework for the subsequent development of more detailed masterplans and other design and planning guidance for the Colchester/Braintree Borders Garden Community.

The DPD and any planning application will address the following principles and requirements in the design, development and delivery of the new garden community:

A. Place-making and design quality

1. The development of a new garden community to high standards of design and layout drawing on its context and the assets within its boundaries including streams, land drains and ditches, mature hedgerows and field boundaries, woodland, existing and re-established habitats, and historic buildings. A mixed use district centre will provide a vibrant heart to this new community supplemented by neighbourhood centres to form foci for new neighbourhoods. The design of the community will also address the challenges offered by other features in particular the severance created by the A12 and A120 and maximise the opportunities afforded through integration with the existing community of Marks Tey, and the presence of the railway station, all underpinned by a strong green-grid of connected green space that provides great recreational opportunities for residents and connection to the wider countryside. The garden community will be designed and developed to have its own identity and be as self-sustaining as possible. Clear separation will be maintained between the new garden community and the nearby settlements of Coggeshall, Stanway, Easthorpe and Feering.

2. Detailed masterplans and design guidance will be put in place to inform and guide development proposals and planning applications. Planning applications for this garden community will be expected to be consistent with approved DPDs and subsequent masterplans and design and planning guidance.

B. Housing

3. A mix of housing types and tenures including self- and custom-build and affordable housing will be provided on the site, including a minimum of 30% affordable housing. The affordable housing will be phased through the development;

4. New residential development will seek to achieve appropriate densities which reflect both context, place-making aspirations and opportunities for increased levels of development around neighbourhood centres and transport hubs.

C. Employment and jobs

5. Employment – Provision for a wide range of job, skills and training opportunities will be created in the garden community. This may include B1 and/or non B class employment generating uses around the rail station as part of mixed use urban development to provide for a wide range of local employment opportunities where appropriate;

6. High speed and reliable broadband will be provided and homes will include specific spaces to enable working from home.

D. Transportation

7. A package of measures will be introduced to encourage smarter transport choices to meet the needs of the new community and maximise the opportunities for sustainable travel including the provision of a network of footpaths, cycleways and bridleways to enhance permeability within the site and to access the adjoining area; development of a public rapid transit system connecting this new garden community to the wider Colchester context; development of opportunities to improve accessibility to Marks Tey rail station (or provide for its relocation to a more central location within the garden community); and effective measures to mitigate the transport impacts of the proposed development on the strategic and local road network. Longer term transport interventions will need to be carefully designed to minimise the impacts on the strategic road network and fully mitigate any environmental or traffic impacts. Other specific transport-related infrastructure requirements identified through the subsequent Strategic Growth Development Plan Document and masterplans for this garden community will be delivered in a phased manner;

8. Primary vehicular access to the site will be provided via the strategic road network;

9. Improvements to the local road infrastructure will be necessary to mitigate adverse traffic impacts and serve the new development. These shall include bus/rapid transit priority measures between the site, Colchester and Braintree town centres, employment areas and rail stations;

10. Foot and cycle ways shall be provided throughout the development and existing communities and surrounding countryside, including seamlessly linking key development areas to the wider network;

11. Opportunities will be explored to establish how Marks Tey rail station can be made more accessible to residents of the new community including relocation of the station to a more central location and improvement of walking, cycling and public transport links to the station.

E Community Infrastructure

12. District and local centres of an appropriate scale will be provided to serve the proposed development. The centres will be located where they will be easily accessible by walking, cycling and public transit to the majority of residents in the garden community including residents of the existing Marks Tey village;

13. Community meeting places will be provided within the district and local centres;

14.      Primary healthcare facilities will be provided to serve the new development;

15. At least one secondary school, primary schools and early-years facilities will be provided to serve the new development;

16. A network of multi-functional green infrastructure will be provided within the garden community incorporating key elements of the existing green assets within the site. It will include community parks, allotments, a new country park and the provision of sports areas with associated facilities and play facilities;

17. Indoor leisure and sports facilities will be provided with the new community, or contributions made to the improvement of off-site leisure facilities to serve the new development.

F. Other Requirements

18. Provision of improvements to waste water treatment including an upgrade to the Colchester Waste Water Treatment Plant and off-site drainage improvements;

19. Provision, management and on-going maintenance of sustainable surface water drainage measures to manage and mitigate the risk of flooding on site and which will reduce the risk of flooding to areas downstream or upstream of the development;

20. Landscape buffers between the site and Coggeshall, Feering, Stanway and Easthorpe;

21. Protection and/or enhancement of heritage and biodiversity assets within and surrounding the site including the SSSI at Marks Tey brick pit, Marks Tey Hall, Easthorpe Hall Farm, Easthorpe Hall and the habitats along and adjoining the Domsey Brook and Roman River corridors;

22. Provision of appropriate buffers along strategic road and rail infrastructure to protect new development;

23. Provision of appropriate design and infrastructure that incorporates the highest standards of innovation in energy efficiency and technology to reduce impact of climate change, water efficiency (with the aim of being water neutral in areas of serious water stress), and sustainable waste / recycling management facilities;

24. Measures to support the development of the new community including provision of community development support workers (or other provision) for a minimum of ten years from initial occupation of the first homes and appropriate community governance structures;

25.   Establishment at an early stage in the development of the garden community, of appropriate and sustainable long-term governance and stewardship arrangements for community assets including green space, public realm areas and community and other relevant facilities; such arrangements to be funded by the development and include community representation to ensure residents have a stake in the long term development, stewardship and management of their community.


(15) Policy SP10 - West of Braintree Garden Community

The adopted policies map, identifies a strategic area for development of a new garden community of which the details and final number of homes will be set out in a Strategic Growth Development Plan Document to be prepared jointly between Braintree DC and Uttlesford DC if applicable and which will incorporate provision of around 2,500 homes within the Plan period (as part of an overall total of between 7,000 – 10,000 homes) in North Essex and provision for Gypsy and Travellers.

Broadfield Farm lies within the garden community search area and is an allocated minerals extraction site within the Essex County Council adopted Minerals Local Plan. The mineral extraction, restoration and after care of the minerals site will need to be planned alongside the wider development of the garden community.

The Strategic Growth DPD will set out the nature and form of the new community. The DPD will be produced in consultation with stakeholders will include a concept plan showing the disposition and quantity of future land-uses, and give a three dimensional indication of the urban design and landscape parameters which will be incorporated into any future planning applications; together with a phasing and implementation strategy which sets out how the rate of development will be linked to the provision of the necessary social and physical infrastructure to ensure that the respective phases of the development do not come forward until the necessary infrastructure has been secured. The DPD will provide the framework for the subsequent development of more detailed masterplans and other design and planning guidance for the West of Braintree Garden Community.

The DPD and any planning application will address the following principles and requirements in the design, development and delivery of the new garden community:

A. Place-making and design quality

1. The development of a new garden community  to high standards of design and layout drawing on its context and the assets within and close  to its boundaries including Boxted Wood, Golden Grove, Rumley Wood, Pods Brook and the historic airfield. The gently sloping topography to the south of the site also affords opportunities for long distance views. These key assets will provide a context to build a new green-grid upon to provide an attractive setting for the new community and linking to the wider countryside. The new community will also address the relationship with existing communities close to its boundaries and maintain a separation between them including Great Saling, Stebbing Green and Rayne. The garden community will be designed and developed to have its own identity and be as self-sustaining as possible.

2. Detailed masterplans and design guidance will be put in place to inform and guide development proposals and planning applications. Planning applications for this garden community will be expected to be consistent with approved DPDs and subsequent masterplans and design and planning guidance.

B. Housing

3. A mix of housing types and tenures including self- and custom-build and starter homes will be provided on the site, including a minimum of 30% affordable housing. The affordable housing will be phased through the development;

4. New residential development will seek to achieve appropriate densities which reflect context, place-making aspirations and opportunities for increased levels of development around neighbourhood centres and transport hubs.

C. Employment and jobs

5. Employment – additional wording pending further evidence base findings. Provision for a wide range of job, skills and training opportunities will be created within the garden community. This may include space for B1, B2 and B8 businesses in the southern part of the community close to the A120 as well as on non-employment park locations throughout the Garden Community to provide for a wide range of local employment opportunities;

6. High speed and reliable broadband will be provided and homes will include specific spaces to enable working from home.

D. Transportation

7. A package of measures will be introduced to encourage smarter transport choices to meet the needs of the new community and maximise the opportunities for sustainable travel including the provision of a network of footpaths, cycleways and bridleways to enhance permeability within the site and to access the adjoining area; development of an effective public transport system; development of opportunities to improve accessibility to local rail stations; and effective measures to mitigate the transport impacts of the proposed development on the strategic and local road network. Improvements to the local road infrastructure will be necessary to mitigate adverse traffic impacts and serve the new development. These shall include bus / rapid transit priority measures between the site, Braintree town centre, rail station and employment areas including the Skyline Business Park and London Stansted Airport. Longer term transport interventions will need to be carefully designed to minimise the impacts on the strategic and local road network and fully mitigate any environmental or traffic impacts arising from the development;

8. Primary vehicular access to the site will be provided via the A120 and B1256;

9. Foot and cycle ways shall be provided throughout the development, including linking the site to Braintree town through the existing Flitch Way linear country park;

10. Other specific transport-related infrastructure requirements identified through the Strategic Growth Development Plan Documents and masterplans for this garden community will be delivered in a phased manner.

E Community Infrastructure

11. District and local centres of an appropriate scale will be provided to serve the proposed new community. The centres will be located where they will be easily accessible by walking, cycling and public transit to the majority of residents in the garden community;

12. Community meeting places will be provided within the district and local centres;

13. Primary healthcare facilities will be provided to serve the new development;

14. Secondary school, primary schools and early-years facilities will be provided to serve the new development;

15. A network of multi-functional green infrastructure will be provided within the garden community. It will include community parks, allotments, the provision of sports areas with associated facilities and play facilities;

16. Indoor leisure and sports facilities will be provided with the new community, or contributions made to the improvement of off-site leisure facilities to serve the new development.

F Other Requirements

17. Provision of improvements to waste water treatment and off-site drainage improvements.

18. Provision, management and on-going maintenance of sustainable surface water drainage measures to manage and mitigate the risk of flooding on site and which will reduce the risk of flooding to areas downstream or upstream of the development.

19. Landscape buffers between the site and Great Saling, Stebbing, Stebbing Green and Rayne.

20. Protection and/or enhancement of heritage and biodiversity assets within and surrounding the site including Great Saling Hall conservation area and areas of deciduous woodland within and adjoining the site.

21. Provision of appropriate buffers along strategic road infrastructure to protect new development.

22. Provision of appropriate design and infrastructure that incorporates the highest standards of energy efficiency and innovation in technology to reduce impact of climate change, water efficiency (with the aim of being water neutral in areas of serious water stress), and sustainable waste / recycling management facilities.

23. Measures to support the development of the new community including provision of community development support workers (or other provision) for a minimum of ten years from initial occupation of the first homes and appropriate community governance structures.

24.   Establishment at an early stage in the development of the garden community, of appropriate and sustainable long-term governance and stewardship arrangements for community assets including green space, public realm areas and community and other relevant facilities; such arrangements to be funded by the development and include community representation to ensure residents have a stake in the long term development, stewardship and management of their community.