Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 11337

Received: 09/12/2025

Respondent: Mr Community Campaigner David Barton

Representation Summary:

Representations are being made with a view to supporting economic growth through the merits of High-Quality style Conservation with the hope of encouraging wider constructive and restorative support through positive and constructive working. It is submitted that TVA should play a key part in any and all policy moving forwards on the grounds of conferring practical benefits be these periodic maintenance, their perceived support from the public, their invaluable contribution to achieving Climate Crisis Targets set local, nationally and internationally alongside their overall cost-effectiveness to key stakeholders alike in terms of Planning and sourcing of raw materials.

Full text:

as previous

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 11627

Received: 24/12/2025

Respondent: Historic England -East of England

Representation Summary:

These sites are located adjacent to the Colchester, Hythe Conservation Area, and numerous Grade II listed buildings.
Initial assessment
While development at these sites may be acceptable, a full Heritage Impact Assessment will be necessary to confirm its suitability from a historic environment perspective and to identify appropriate mitigation measures or opportunities for enhancement. The resulting recommendations should then be incorporated into criteria ‘g’, ‘f’ and ‘d’ of the corresponding policies.

Full text:

These sites are located adjacent to the Colchester, Hythe Conservation Area, and numerous Grade II listed buildings.
Initial assessment
While development at these sites may be acceptable, a full Heritage Impact Assessment will be necessary to confirm its suitability from a historic environment perspective and to identify appropriate mitigation measures or opportunities for enhancement. The resulting recommendations should then be incorporated into criteria ‘g’, ‘f’ and ‘d’ of the corresponding policies.

Object

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 11935

Received: 06/01/2026

Respondent: Mr Adam Fitton

Representation Summary:

If adding more housing, relief roads for vehicular access should be re-addressed. Open Boundary Road, and Hythe Level Crossing to all traffic to ease congestion.

Full text:

I am largely in support of this proposal and the area in which it is proposed however I have concerns about the traffic control around the area which are currently in place. I have emailed numerous councillors (who I will not name) but to no avail. if the site is to be regenerated, the bus lane at the Hythe level crossing should be open to all traffic, and progress made to open Boundary Road for all traffic. As in this area there are now 3 bus lanes including the new one on Clingoe Hill, yet all other traffic is forced into a bottle neck over by Tesco Hythe.

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 13780

Received: 14/01/2026

Respondent: Anglian Water Services

Agent: Anglian Water Services

Representation Summary:

Anglian Water supports policy criteria i, j, and k to mitigate flood and pollution risks through SuDS, water efficiency, and wastewater treatment capacity. For brownfield redevelopment or altered drainage, new development should reduce surface water flow to combined sewers in both volume and discharge rate; no new surface water connections will be permitted. Existing assets, including surface water and large diameter combined sewers, require safeguarding, and Anglian Water requests policy wording in NZ3 to ensure access for maintenance. The site is highly flood-prone, with 24% in Flood Zone 3b. Anglian Water questions regeneration benefits versus climate change and flood risks.

Full text:

See attachment with detailed comments on numerous policies. Anglian Water welcomes the opportunity to contribute comments on the Draft
Local Plan for Colchester City Council. We consider that the Plan is well set out with in relation
to managing flood risk, surface water and wastewater, and enabling water efficiency. We
recognise the challenges for meeting the uplift in housing requirements and the
infrastructure required to help deliver future growth across the district, with the main
focus being Colchester and the larger towns.
We have raised some policy matters relating to consistency between policies addressing surface
water flood risk, water supply, and wastewater, and how these matters are attributed to site
allocation policies.
We look forward to continuing our positive and proactive discussions with the Council in
respect of our comments and the next iteration of the Local Plan, including supporting updates
to the evidence base if required

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 14229

Received: 14/01/2026

Respondent: Environment Agency

Representation Summary:

• Site wholly covered by Flood Zone 2 with areas of flood zone 3 in southeast
quarter. The site is also likely to be at residual risk in the event of a
failure/breach of the Colne Barrier.
We would therefore advise that this site is brought forward for detailed site
assessment in a Level 2 SFRA

Full text:

see attached

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 14488

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Coal Yard Site, development should avoid the flood zones and adhere to the standards in the Sustainable Systems Guide for Essex the area falls within CDA NCOL_08 Parsons Heath, discharge of surface water should be at the 1 in 1 greenfield rate. Discharge of surface water should not be to the foul or combined network. Consideration should be given to rainwater harvesting.

Full text:

Officer summary of full submission. See attachment with detailed comments on numerous policies:
The overall message is one of support for CCC undertaking a review of the adopted Local Plan to ensure an up to date plan prepared in accordance with the NPPF is in place. ECC will continue the on-going engagement with CCC, through the Duty (or any replacement), to assist progress of the Plan to Regulation 19 (the Pre-Submission Plan), particularly with regards the strategic and cross boundary implications, including cumulative issues and opportunities arising from growth to ensure that the infrastructure requirements are identified, quantified, costed and phased where appropriate. ECC service areas have clearly outlined where further collaborative work/assessment needs to be undertaken (e.g. education provision and ongoing transportation modelling) to refine and resolve an issue; and ECC will continue to be engaged, alongside NH, on the proposals which have an impact on the A12 strategic transport corridor, in particular A12 junctions 25 to 28, A12 widening and junction improvements, and the A120 Corridor Maks Tey to Braintree.

There is support for the Draft Plan’s vision which covers environmental, social and economic needs and emphasises healthy living environments and green networks, environmental protection and economic growth. There is support that the mandatory housing target will be met in full and exceeded over the Plan period in accordance with the NPPF, and that future employment needs will be met (noting that some clarifications are sought) by providing a range in scale of additional employment land supply. ECC provides strong support for policies related to net zero carbon (in operation and embodied), water efficiency, health and well-being, and the environment (green and blue infrastructure and BNG. Recommendations are made throughout the response on policy wording (including policy omissions) and justification to strengthen clarity, effectiveness and delivery.

There is strong support for the inclusion of site-specific Place Policies and references to infrastructure requirements, but these will need to be reviewed and confirmed with ECC following this consultation and the agreement of a final spatial strategy by CCC. It is noted there are some omissions in the Draft Plan such as the allocation of a new secondary school. On this issue, ECC acknowledges the requirement is stated in the Infrastructure Assessment Delivery Plan (Stage 3) for site allocation PP18 Land North of A120 Marks Tey; and in the Infrastructure Topic Paper prepared by CCC, where Appendix A lists the infrastructure requirements for the preferred options site allocations (including those for education). Land for the secondary school (and all education requirements) will need to be allocated in the Pre-Submission Plan.

The review of the IDP and full plan viability assessment are key documents for ECC engagement and input following this round of consultation. The Viability Assessment will need to be reviewed following consultation to ensure it can align with the most up to date evidence relating to the EPOA net zero development policies and its viability evidence. Mention is also made in the response to specific localities and sites – notably Marks Tey and Langham – where discussion needs to take place and recommendations are made to ensure effective delivery if these proposed allocations are taken forward to the Pre-Submission Plan.