Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11341
Received: 09/12/2025
Respondent: Mr Community Campaigner David Barton
Representations are being made with a view to supporting economic growth through the merits of High-Quality style Conservation with the hope of encouraging wider constructive and restorative support through positive and constructive working. It is submitted that TVA should play a key part in any and all policy moving forwards on the grounds of conferring practical benefits be these periodic maintenance, their perceived support from the public, their invaluable contribution to achieving Climate Crisis Targets set local, nationally and internationally alongside their overall cost-effectiveness to key stakeholders alike in terms of Planning and sourcing of raw materials.
as previous
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11630
Received: 24/12/2025
Respondent: Historic England -East of England
Effects uncertain. We agree that a proforma Heritage Impact Assessment will be essential to determine whether the site is suitable from a historic environment perspective and to identify appropriate mitigation measures or opportunities for enhancement. The resulting recommendations should then be incorporated into criteria ‘g’ of Policy PEP2.
The site is located partially within the Wivenhoe Park Registered Park and Garden (LEN 1000371), and potentially within the wider setting of a number of other designated heritage assets, including the Group of barrows at Annan Road Scheduled Monument (LEN 1464139). Development has potential for direct impact and indirect impact on setting of Registered Park and Garden and Scheduled Monument.
Initial assessment
Effects uncertain. We agree that a proforma Heritage Impact Assessment will be essential to determine whether the site is suitable from a historic environment perspective and to identify appropriate mitigation measures or opportunities for enhancement. The resulting recommendations should then be incorporated into criteria ‘g’ of Policy PEP2.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13786
Received: 14/01/2026
Respondent: Anglian Water Services
Agent: Anglian Water Services
Anglian Water recognises that some of the Knowledge Gateway is already
developed and there are further economic growth opportunities in this area
for associated development to come forward to maximise the economic and
social benefits associated with the University. We would request that similar
policy criteria to other allocation sites are included to ensure that flood risk
and pollution risks can be avoided through appropriate mitigation to
manage surface water run-off through SuDS, improving water efficiency,
and ensuring there is wastewater treatment capacity.
See attachment with detailed comments on numerous policies. Anglian Water welcomes the opportunity to contribute comments on the Draft
Local Plan for Colchester City Council. We consider that the Plan is well set out with in relation
to managing flood risk, surface water and wastewater, and enabling water efficiency. We
recognise the challenges for meeting the uplift in housing requirements and the
infrastructure required to help deliver future growth across the district, with the main
focus being Colchester and the larger towns.
We have raised some policy matters relating to consistency between policies addressing surface
water flood risk, water supply, and wastewater, and how these matters are attributed to site
allocation policies.
We look forward to continuing our positive and proactive discussions with the Council in
respect of our comments and the next iteration of the Local Plan, including supporting updates
to the evidence base if required
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14234
Received: 14/01/2026
Respondent: Environment Agency
• Areas of Flood Zone 2 and 3 near western boundary of site, Area of climate
change increase to zones also.
The western boundary of the site is also likely to be at residual risk in the
event of a failure/breach of the Colne Barrier.
We would therefore advise that this site is brought forward for detailed site
assessment in a Level 2 SFRA
see attached
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14484
Received: 14/01/2026
Respondent: Essex County Council Spatial Planning
Knowledge Gateway this area is not within a CDA and has some local ponding of surface water where development should be avoided.
Officer summary of full submission. See attachment with detailed comments on numerous policies:
The overall message is one of support for CCC undertaking a review of the adopted Local Plan to ensure an up to date plan prepared in accordance with the NPPF is in place. ECC will continue the on-going engagement with CCC, through the Duty (or any replacement), to assist progress of the Plan to Regulation 19 (the Pre-Submission Plan), particularly with regards the strategic and cross boundary implications, including cumulative issues and opportunities arising from growth to ensure that the infrastructure requirements are identified, quantified, costed and phased where appropriate. ECC service areas have clearly outlined where further collaborative work/assessment needs to be undertaken (e.g. education provision and ongoing transportation modelling) to refine and resolve an issue; and ECC will continue to be engaged, alongside NH, on the proposals which have an impact on the A12 strategic transport corridor, in particular A12 junctions 25 to 28, A12 widening and junction improvements, and the A120 Corridor Maks Tey to Braintree.
There is support for the Draft Plan’s vision which covers environmental, social and economic needs and emphasises healthy living environments and green networks, environmental protection and economic growth. There is support that the mandatory housing target will be met in full and exceeded over the Plan period in accordance with the NPPF, and that future employment needs will be met (noting that some clarifications are sought) by providing a range in scale of additional employment land supply. ECC provides strong support for policies related to net zero carbon (in operation and embodied), water efficiency, health and well-being, and the environment (green and blue infrastructure and BNG. Recommendations are made throughout the response on policy wording (including policy omissions) and justification to strengthen clarity, effectiveness and delivery.
There is strong support for the inclusion of site-specific Place Policies and references to infrastructure requirements, but these will need to be reviewed and confirmed with ECC following this consultation and the agreement of a final spatial strategy by CCC. It is noted there are some omissions in the Draft Plan such as the allocation of a new secondary school. On this issue, ECC acknowledges the requirement is stated in the Infrastructure Assessment Delivery Plan (Stage 3) for site allocation PP18 Land North of A120 Marks Tey; and in the Infrastructure Topic Paper prepared by CCC, where Appendix A lists the infrastructure requirements for the preferred options site allocations (including those for education). Land for the secondary school (and all education requirements) will need to be allocated in the Pre-Submission Plan.
The review of the IDP and full plan viability assessment are key documents for ECC engagement and input following this round of consultation. The Viability Assessment will need to be reviewed following consultation to ensure it can align with the most up to date evidence relating to the EPOA net zero development policies and its viability evidence. Mention is also made in the response to specific localities and sites – notably Marks Tey and Langham – where discussion needs to take place and recommendations are made to ensure effective delivery if these proposed allocations are taken forward to the Pre-Submission Plan.