Showing comments and forms 1 to 6 of 6

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 11349

Received: 09/12/2025

Respondent: Mr Community Campaigner David Barton

Representation Summary:

Representations are being made with a view to supporting economic growth through the merits of High-Quality style Conservation with the hope of encouraging wider constructive and restorative support through positive and constructive working. It is submitted that TVA should play a key part in any and all policy moving forwards on the grounds of conferring practical benefits be these periodic maintenance, their perceived support from the public, their invaluable contribution to achieving Climate Crisis Targets set local, nationally and internationally alongside their overall cost-effectiveness to key stakeholders alike in terms of Planning and sourcing of raw materials.

Full text:

as previous

Support

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 11442

Received: 12/12/2025

Respondent: Tiptree Parish Council

Representation Summary:

Tiptree Parish Council supports this policy.

Full text:

Tiptree Parish Council supports this policy.

Object

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 13197

Received: 08/01/2026

Respondent: Feering Parish Council

Representation Summary:

Feering Parish Council response to Colchester City Council’s Regulation 18 Consultation regarding proposed allocations in Tiptree, Messing and Marks Tey. The Council is concerned that development near the B1023 and along the Inworth Road corridor would significantly increase traffic on an already congested and overstretched highway network, worsening safety and movement. With Government funding withdrawn for the A12 expansion, previously anticipated junction and infrastructure improvements may not be delivered, leaving cumulative impacts unmitigated. The Parish Council cannot support these allocations without clear, deliverable traffic mitigation. It also urges robust mitigation for congestion at A12 junction 25.

Full text:

Feering Parish Council response to Colchester City Council’s Regulation 18 Consultation regarding proposed allocations in Tiptree, Messing and Marks Tey. The Council is concerned that development near the B1023 and along the Inworth Road corridor would significantly increase traffic on an already congested and overstretched highway network, worsening safety and movement. With Government funding withdrawn for the A12 expansion, previously anticipated junction and infrastructure improvements may not be delivered, leaving cumulative impacts unmitigated. The Parish Council cannot support these allocations without clear, deliverable traffic mitigation. It also urges robust mitigation for congestion at A12 junction 25.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 13797

Received: 14/01/2026

Respondent: Anglian Water Services

Agent: Anglian Water Services

Representation Summary:

Anglian Water notes Policy PP21 lacks criteria to mitigate flood and pollution risks, manage surface water via SuDS, improve water efficiency, and ensure wastewater treatment capacity with phasing where needed. New development must provide separate foul and stormwater drainage networks. Anglian Water requests inclusion of these criteria for consistency across site allocations and recognition that network and WRC capacity changes over time. They welcome the requirement for a comprehensive masterplan developed collaboratively. Tiptree WRC currently has short-term capacity but will need investment for full growth. Future DWMPs will address long-term challenges, including climate change, asset health, and population growth.

Full text:

See attachment with detailed comments on numerous policies. Anglian Water welcomes the opportunity to contribute comments on the Draft
Local Plan for Colchester City Council. We consider that the Plan is well set out with in relation
to managing flood risk, surface water and wastewater, and enabling water efficiency. We
recognise the challenges for meeting the uplift in housing requirements and the
infrastructure required to help deliver future growth across the district, with the main
focus being Colchester and the larger towns.
We have raised some policy matters relating to consistency between policies addressing surface
water flood risk, water supply, and wastewater, and how these matters are attributed to site
allocation policies.
We look forward to continuing our positive and proactive discussions with the Council in
respect of our comments and the next iteration of the Local Plan, including supporting updates
to the evidence base if required

Attachments:

Support

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 13825

Received: 14/01/2026

Respondent: Mrs Susan Allen-Shepherd

Representation Summary:

This site was favoured to be part of the Neighbourhood Plan, but speculative development elsewhere prevented it being included in the plan. It would be useful if this site also had a connection into the Neighbourhood Plan allocated site.

Full text:

This site was favoured to be part of the Neighbourhood Plan, but speculative development elsewhere prevented it being included in the plan. It would be useful if this site also had a connection into the Neighbourhood Plan allocated site.

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Representation ID: 14476

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Highland Kelvedon Road not within a CDA, development should follow the standards in the Sustainable Drainage Systems Guide for Essex, following the drainage hierarchy and discharging at the 1 in 1 greenfield rate.

Full text:

Officer summary of full submission. See attachment with detailed comments on numerous policies:
The overall message is one of support for CCC undertaking a review of the adopted Local Plan to ensure an up to date plan prepared in accordance with the NPPF is in place. ECC will continue the on-going engagement with CCC, through the Duty (or any replacement), to assist progress of the Plan to Regulation 19 (the Pre-Submission Plan), particularly with regards the strategic and cross boundary implications, including cumulative issues and opportunities arising from growth to ensure that the infrastructure requirements are identified, quantified, costed and phased where appropriate. ECC service areas have clearly outlined where further collaborative work/assessment needs to be undertaken (e.g. education provision and ongoing transportation modelling) to refine and resolve an issue; and ECC will continue to be engaged, alongside NH, on the proposals which have an impact on the A12 strategic transport corridor, in particular A12 junctions 25 to 28, A12 widening and junction improvements, and the A120 Corridor Maks Tey to Braintree.

There is support for the Draft Plan’s vision which covers environmental, social and economic needs and emphasises healthy living environments and green networks, environmental protection and economic growth. There is support that the mandatory housing target will be met in full and exceeded over the Plan period in accordance with the NPPF, and that future employment needs will be met (noting that some clarifications are sought) by providing a range in scale of additional employment land supply. ECC provides strong support for policies related to net zero carbon (in operation and embodied), water efficiency, health and well-being, and the environment (green and blue infrastructure and BNG. Recommendations are made throughout the response on policy wording (including policy omissions) and justification to strengthen clarity, effectiveness and delivery.

There is strong support for the inclusion of site-specific Place Policies and references to infrastructure requirements, but these will need to be reviewed and confirmed with ECC following this consultation and the agreement of a final spatial strategy by CCC. It is noted there are some omissions in the Draft Plan such as the allocation of a new secondary school. On this issue, ECC acknowledges the requirement is stated in the Infrastructure Assessment Delivery Plan (Stage 3) for site allocation PP18 Land North of A120 Marks Tey; and in the Infrastructure Topic Paper prepared by CCC, where Appendix A lists the infrastructure requirements for the preferred options site allocations (including those for education). Land for the secondary school (and all education requirements) will need to be allocated in the Pre-Submission Plan.

The review of the IDP and full plan viability assessment are key documents for ECC engagement and input following this round of consultation. The Viability Assessment will need to be reviewed following consultation to ensure it can align with the most up to date evidence relating to the EPOA net zero development policies and its viability evidence. Mention is also made in the response to specific localities and sites – notably Marks Tey and Langham – where discussion needs to take place and recommendations are made to ensure effective delivery if these proposed allocations are taken forward to the Pre-Submission Plan.

Attachments: