Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11365
Received: 09/12/2025
Respondent: Mr Community Campaigner David Barton
Representations are being made with a view to supporting economic growth through the merits of High-Quality style Conservation with the hope of encouraging wider constructive and restorative support through positive and constructive working. It is submitted that TVA should play a key part in any and all policy moving forwards on the grounds of conferring practical benefits be these periodic maintenance, their perceived support from the public, their invaluable contribution to achieving Climate Crisis Targets set local, nationally and internationally alongside their overall cost-effectiveness to key stakeholders alike in terms of Planning and sourcing of raw materials.
as previous
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11644
Received: 24/12/2025
Respondent: Historic England -East of England
The site is potentially located within the setting of four Grade II listed buildings.
Initial assessment
While development at this site may be acceptable, a proforma Heritage Impact Assessment will help to confirm the site’s suitability from a historic environment perspective and to identify appropriate mitigation measures or opportunities for enhancement. The resulting recommendations should then be incorporated into criteria ‘c’ of the policy.
The site is potentially located within the setting of four Grade II listed buildings.
Initial assessment
While development at this site may be acceptable, a proforma Heritage Impact Assessment will help to confirm the site’s suitability from a historic environment perspective and to identify appropriate mitigation measures or opportunities for enhancement. The resulting recommendations should then be incorporated into criteria ‘c’ of the policy.
Object
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13136
Received: 13/01/2026
Respondent: Aldham Parish Council
The Parish Council would object to this allocation if it resu;lted in what would be a third access on to the A1124 within a few hundred metres, together , which will create congestion and safety issues with John Flower Way and the proposed T junction for PP32. This allocation should be linked with the proposed alternative allocation to PP32, east of PEP9, to form a single access point for all three sites to form a roundabout junction with John Flower Way, including a safe crossing and appropriate lighting.
The Parish Council would object to this allocation if it resu;lted in what would be a third access on to the A1124 within a few hundred metres, together , which will create congestion and safety issues with John Flower Way and the proposed T junction for PP32. This allocation should be linked with the proposed alternative allocation to PP32, east of PEP9, to form a single access point for all three sites to form a roundabout junction with John Flower Way, including a safe crossing and appropriate lighting.
Object
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13419
Received: 13/01/2026
Respondent: Mr James Hickland
It is difficult to see how there is a need for employment land at this rural location, or that employment land would be useful at this location. Carbon emissions would be increased, and rural character lost.
The owners of this land, who also own the PP32 site, seem to want to concrete over and urbanise this large unspoiled rural countryside area on each side of Halstead Road, which is a vital green break between small settlements, for massive personal financial gain, regardless of the negative effect on the community, the landscape and the environment.
It is difficult to see how there is a need for employment land at this rural location, or that employment land would be useful at this location. Carbon emissions would be increased, and rural character lost.
The owners of this land, who also own the PP32 site, seem to want to concrete over and urbanise this large unspoiled rural countryside area on each side of Halstead Road, which is a vital green break between small settlements, for massive personal financial gain, regardless of the negative effect on the community, the landscape and the environment.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13829
Received: 14/01/2026
Respondent: Anglian Water Services
Agent: Anglian Water Services
We would request that these policy criteria
to mirror those in other Local Plan policies, are included in Policy PEP9 to
ensure a consistent approach to site allocations, and to recognise that
network and WRC capacity is dynamic and can change over time owing to a
range of factors.
We request a clause is included to state: Development must not discharge
surface water to the foul water network.
See comments regarding Eight Ash Green WRC set out in Policy PP31.
See attachment with detailed comments on numerous policies. Anglian Water welcomes the opportunity to contribute comments on the Draft
Local Plan for Colchester City Council. We consider that the Plan is well set out with in relation
to managing flood risk, surface water and wastewater, and enabling water efficiency. We
recognise the challenges for meeting the uplift in housing requirements and the
infrastructure required to help deliver future growth across the district, with the main
focus being Colchester and the larger towns.
We have raised some policy matters relating to consistency between policies addressing surface
water flood risk, water supply, and wastewater, and how these matters are attributed to site
allocation policies.
We look forward to continuing our positive and proactive discussions with the Council in
respect of our comments and the next iteration of the Local Plan, including supporting updates
to the evidence base if required
Support
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13861
Received: 14/01/2026
Respondent: Mrs Farah Horst
I support changes and considered redevelopment of the proposed employment site of Bullbanks Farm with reference to the EAG Neighbourhood Plan and the EAG Village Design Statement.
I support changes and considered redevelopment of the proposed employment site of Bullbanks Farm with reference to the EAG Neighbourhood Plan and the EAG Village Design Statement.
Support
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13862
Received: 14/01/2026
Respondent: Mr Marcel Horst
I support changes and considered redevelopment of the proposed employment site of Bullbanks Farm with reference to the EAG Neighbourhood Plan and the EAG Village Design Statement.
I support changes and considered redevelopment of the proposed employment site of Bullbanks Farm with reference to the EAG Neighbourhood Plan and the EAG Village Design Statement.
Support
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13906
Received: 14/01/2026
Respondent: Mr G FRENCH
Agent: Foxes Rural Consultants
The site at Bullbanks Farm is suitable, available and achievable for employment use. It is in single ownership, free of constraints, well located off the A1124 near the A12, and compatible with surrounding commercial and residential development. It benefits from good highway access, public transport, pedestrian links and nearby new infrastructure. The site is not affected by flood risk or statutory designations and has no abnormal development costs. Allocation would complement Colchester’s employment land portfolio, meet identified economic need for small to mid-sized sites, support job creation, and accord with national and local planning policy objectives.
The site at Bullbanks Farm is suitable, available and achievable for employment use. It is in single ownership, free of constraints, well located off the A1124 near the A12, and compatible with surrounding commercial and residential development. It benefits from good highway access, public transport, pedestrian links and nearby new infrastructure. The site is not affected by flood risk or statutory designations and has no abnormal development costs. Allocation would complement Colchester’s employment land portfolio, meet identified economic need for small to mid-sized sites, support job creation, and accord with national and local planning policy objectives.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14395
Received: 13/01/2026
Respondent: Colchester Cycle Campaign
EIGHT ASH GREEN The village needs a spine cycle route similar to that which is being proposed for Great Horkesley.
Consideration should be given to tying in the village to the Colchester cycle network via Halstead Road.
Improved walking/cycling connections are needed with Stane Park. More use should be made of the Lucy Lane tunnel – it should be well signed and central to improvement schemes.
See our observations on reducing the attractiveness of country lanes for motor vehicle drivers and stopping rat runs.
See Full Submission attachment
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14462
Received: 14/01/2026
Respondent: Essex County Council Spatial Planning
Bullbanks development should follow the standards in the Sustainable Drainage Systems Guide for Essex, following the drainage hierarchy and discharging at the 1 in 1 greenfield rate.
Officer summary of full submission. See attachment with detailed comments on numerous policies:
The overall message is one of support for CCC undertaking a review of the adopted Local Plan to ensure an up to date plan prepared in accordance with the NPPF is in place. ECC will continue the on-going engagement with CCC, through the Duty (or any replacement), to assist progress of the Plan to Regulation 19 (the Pre-Submission Plan), particularly with regards the strategic and cross boundary implications, including cumulative issues and opportunities arising from growth to ensure that the infrastructure requirements are identified, quantified, costed and phased where appropriate. ECC service areas have clearly outlined where further collaborative work/assessment needs to be undertaken (e.g. education provision and ongoing transportation modelling) to refine and resolve an issue; and ECC will continue to be engaged, alongside NH, on the proposals which have an impact on the A12 strategic transport corridor, in particular A12 junctions 25 to 28, A12 widening and junction improvements, and the A120 Corridor Maks Tey to Braintree.
There is support for the Draft Plan’s vision which covers environmental, social and economic needs and emphasises healthy living environments and green networks, environmental protection and economic growth. There is support that the mandatory housing target will be met in full and exceeded over the Plan period in accordance with the NPPF, and that future employment needs will be met (noting that some clarifications are sought) by providing a range in scale of additional employment land supply. ECC provides strong support for policies related to net zero carbon (in operation and embodied), water efficiency, health and well-being, and the environment (green and blue infrastructure and BNG. Recommendations are made throughout the response on policy wording (including policy omissions) and justification to strengthen clarity, effectiveness and delivery.
There is strong support for the inclusion of site-specific Place Policies and references to infrastructure requirements, but these will need to be reviewed and confirmed with ECC following this consultation and the agreement of a final spatial strategy by CCC. It is noted there are some omissions in the Draft Plan such as the allocation of a new secondary school. On this issue, ECC acknowledges the requirement is stated in the Infrastructure Assessment Delivery Plan (Stage 3) for site allocation PP18 Land North of A120 Marks Tey; and in the Infrastructure Topic Paper prepared by CCC, where Appendix A lists the infrastructure requirements for the preferred options site allocations (including those for education). Land for the secondary school (and all education requirements) will need to be allocated in the Pre-Submission Plan.
The review of the IDP and full plan viability assessment are key documents for ECC engagement and input following this round of consultation. The Viability Assessment will need to be reviewed following consultation to ensure it can align with the most up to date evidence relating to the EPOA net zero development policies and its viability evidence. Mention is also made in the response to specific localities and sites – notably Marks Tey and Langham – where discussion needs to take place and recommendations are made to ensure effective delivery if these proposed allocations are taken forward to the Pre-Submission Plan.