Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 11372
Received: 09/12/2025
Respondent: Mr Community Campaigner David Barton
Representations are being made with a view to supporting economic growth through the merits of High-Quality style Conservation with the hope of encouraging wider constructive and restorative support through positive and constructive working. It is submitted that TVA should play a key part in any and all policy moving forwards on the grounds of conferring practical benefits be these periodic maintenance, their perceived support from the public, their invaluable contribution to achieving Climate Crisis Targets set local, nationally and internationally alongside their overall cost-effectiveness to key stakeholders alike in terms of Planning and sourcing of raw materials.
as previous
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 12270
Received: 09/01/2026
Respondent: British Horse Society
Direct impact on Bridleway 45 Langham. Provisions should be made to minimise disruption to pedestrians, cyclists, and horse riders, such as additional green spaces and new PRoWs within the development, and to aim for circular multi-user routes (MURs) to ensure inclusivity for all non-motorised users, at a minimum, to Bridleway status. MURs function as public highways and are best defined as restricted byways—open to pedestrians, horse riders, cyclists, and users of non-motorised vehicles—or as bridleways, which permit access for pedestrians, horse riders, and cyclists. Need to preserve the area's rural character and bridleway access.
Direct impact on Bridleway 45 Langham. Provisions should be made to minimise disruption to pedestrians, cyclists, and horse riders, such as additional green spaces and new PRoWs within the development, and to aim for circular multi-user routes (MURs) to ensure inclusivity for all non-motorised users, at a minimum, to Bridleway status. MURs function as public highways and are best defined as restricted byways—open to pedestrians, horse riders, cyclists, and users of non-motorised vehicles—or as bridleways, which permit access for pedestrians, horse riders, and cyclists. Need to preserve the area's rural character and bridleway access.
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 13474
Received: 14/01/2026
Respondent: Mrs Clare Dobie
Impact on BW 45
(note added by Officer, BW = Bridleway)
Impact on BW 45
(note added by Officer, BW = Bridleway)
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14414
Received: 13/01/2026
Respondent: Colchester Cycle Campaign
Langham: Upgrade of the bridleway between Langham Lane and Lodge Lane, and cycling improvements to Turnpike Lane and Old Ipswich Road to provide a route between Langham and Ardleigh
We would hope that if development in Langham does go ahead then high-quality routes will be provided within the development and to connect to Colchester and neighbouring villages. This should include a new cycle/footbridge across the A12 or improved provision on the currentNorthern Gateway bridge.
Note this Sustrans report: https://boxtedparishcouncil.org.uk/wp-content/uploads/2023/09/colchester-boxted-fs.pdf
See our observations on reducing the attractiveness of country lanes for motor vehicle drivers and stopping rat runs.
See Full Submission attachment
Comment
Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025
Representation ID: 14455
Received: 14/01/2026
Respondent: Essex County Council Spatial Planning
Lodge Lane The development should follow the standards in the Sustainable Drainage Systems Guide for Essex, following the drainage hierarchy and discharging at the 1 in 1 greenfield rate. Where there are pockets of surface water the drainage strategy should evidence how these will be dealt with.
Officer summary of full submission. See attachment with detailed comments on numerous policies:
The overall message is one of support for CCC undertaking a review of the adopted Local Plan to ensure an up to date plan prepared in accordance with the NPPF is in place. ECC will continue the on-going engagement with CCC, through the Duty (or any replacement), to assist progress of the Plan to Regulation 19 (the Pre-Submission Plan), particularly with regards the strategic and cross boundary implications, including cumulative issues and opportunities arising from growth to ensure that the infrastructure requirements are identified, quantified, costed and phased where appropriate. ECC service areas have clearly outlined where further collaborative work/assessment needs to be undertaken (e.g. education provision and ongoing transportation modelling) to refine and resolve an issue; and ECC will continue to be engaged, alongside NH, on the proposals which have an impact on the A12 strategic transport corridor, in particular A12 junctions 25 to 28, A12 widening and junction improvements, and the A120 Corridor Maks Tey to Braintree.
There is support for the Draft Plan’s vision which covers environmental, social and economic needs and emphasises healthy living environments and green networks, environmental protection and economic growth. There is support that the mandatory housing target will be met in full and exceeded over the Plan period in accordance with the NPPF, and that future employment needs will be met (noting that some clarifications are sought) by providing a range in scale of additional employment land supply. ECC provides strong support for policies related to net zero carbon (in operation and embodied), water efficiency, health and well-being, and the environment (green and blue infrastructure and BNG. Recommendations are made throughout the response on policy wording (including policy omissions) and justification to strengthen clarity, effectiveness and delivery.
There is strong support for the inclusion of site-specific Place Policies and references to infrastructure requirements, but these will need to be reviewed and confirmed with ECC following this consultation and the agreement of a final spatial strategy by CCC. It is noted there are some omissions in the Draft Plan such as the allocation of a new secondary school. On this issue, ECC acknowledges the requirement is stated in the Infrastructure Assessment Delivery Plan (Stage 3) for site allocation PP18 Land North of A120 Marks Tey; and in the Infrastructure Topic Paper prepared by CCC, where Appendix A lists the infrastructure requirements for the preferred options site allocations (including those for education). Land for the secondary school (and all education requirements) will need to be allocated in the Pre-Submission Plan.
The review of the IDP and full plan viability assessment are key documents for ECC engagement and input following this round of consultation. The Viability Assessment will need to be reviewed following consultation to ensure it can align with the most up to date evidence relating to the EPOA net zero development policies and its viability evidence. Mention is also made in the response to specific localities and sites – notably Marks Tey and Langham – where discussion needs to take place and recommendations are made to ensure effective delivery if these proposed allocations are taken forward to the Pre-Submission Plan.