Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Search representations

Results for Kler Group search

New search New search

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy GN1: Open Space and Green Network and Waterways Principles

Representation ID: 14201

Received: 14/01/2026

Respondent: Kler Group

Agent: Mr Michael Robson

Representation Summary:

The Green Network policies GN1 and GN2 should be applied to reinforce this delivery focus. Where Brook Meadows is identified as a strategic biodiversity and green network asset, the Plan should require that proposals (or delivery mechanisms) for the Site are underpinned by a clear management plan and that the Site's function as part of the wider green network is protected and enhanced. This is consistent with the Council's stated intention, through EN2, to prioritise locations capable of delivering the best gains for biodiversity.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy GN2: Strategic Green Spaces and Nature Recovery

Representation ID: 14202

Received: 14/01/2026

Respondent: Kler Group

Agent: Mr Michael Robson

Representation Summary:

The Green Network policies GN1 and GN2 should be applied to reinforce this delivery focus. Where Brook Meadows is identified as a strategic biodiversity and green network asset, the Plan should require that proposals (or delivery mechanisms) for the Site are underpinned by a clear management plan and that the Site's function as part of the wider green network is protected and enhanced. This is consistent with the Council's stated intention, through EN2, to prioritise locations capable of delivering the best gains for biodiversity.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy GN5: Suitable Alternative Natural Greenspace

Representation ID: 14203

Received: 14/01/2026

Respondent: Kler Group

Agent: Mr Michael Robson

Representation Summary:

Policies GN5 and GN6 are also relevant because they provide the policy pathway for protecting and strengthening ecological networks and securing effective management of green infrastructure assets. In plan-making terms, those policies should be translated into allocation criteria for Brook Meadows that secure, at minimum:
the protection of sensitive ecological areas and appropriate buffering;
habitat creation and enhancement as the primary structuring principle;
appropriate access arrangements where compatible with biodiversity objectives; and
binding long-term management and monitoring arrangements so that gains are maintained, not eroded over time.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy GN6: Retention of Open Space

Representation ID: 14204

Received: 14/01/2026

Respondent: Kler Group

Agent: Mr Michael Robson

Representation Summary:

Policies GN5 and GN6 are also relevant because they provide the policy pathway for protecting and strengthening ecological networks and securing effective management of green infrastructure assets. In plan-making terms, those policies should be translated into allocation criteria for Brook Meadows that secure, at minimum:
the protection of sensitive ecological areas and appropriate buffering;
habitat creation and enhancement as the primary structuring principle;
appropriate access arrangements where compatible with biodiversity objectives; and
binding long-term management and monitoring arrangements so that gains are maintained, not eroded over time.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy EN5: New and Existing Trees

Representation ID: 14205

Received: 14/01/2026

Respondent: Kler Group

Agent: Mr Michael Robson

Representation Summary:

Policy ENS is relevant because it

reinforces the need for environmental objectives to be embedded into delivery, rather than being left as aspirational requirements that can be diluted at implementation stage.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.