14. Appendices Comment
14.1Colchester Local Plan Section 1 (February 2021) and Section 2 (July 2022) will be superseded by the Colchester Local Plan 2026 to 2043. The table below sets out the adopted Local Plan policies and the name of the relevant new policy. It also identifies any policies which are to be saved from the Section One Local P Lan.
|
Colchester Local Plan 2017 to 2033 |
Colchester Local Plan 2026 to 2043 |
||
|
Existing Policy Reference |
Existing Policy Name |
New Policy Reference |
New Policy Name |
|
Section 1 |
|||
|
SP1 |
Presumption in Favour of Sustainable Development |
||
|
SP2 |
Recreational disturbance Avoidance and Mitigation Strategy (RAMS) |
EN1 |
Nature Conservation and Designated Sites |
|
SP3 |
Spatial Strategy for North Essex |
ST3 ST4 |
Spatial Strategy Development in the Countryside |
|
SP4 |
Meeting Housing Needs |
ST5 |
Colchester’s Housing Need |
|
SP5 |
Providing for Employment |
ST6 |
Colchester’s Employment Need |
|
SP6 |
Infrastructure and Connectivity |
ST7 |
Infrastructure Delivery and Impact Mitigation |
|
SP7 |
Place Shaping Principles |
ST8 |
Placemaking Principles |
|
SP8 |
Development and Delivery of New Garden Community in North Essex |
Saved |
|
|
SP9 |
Tendring/Colchester Borders Garden Community |
Saved |
|
|
Section 2 |
|||
|
SG1 |
Colchester’s Spatial Strategy |
ST3 ST4 |
Spatial Strategy Development in the Countryside |
|
SG2 |
Housing Delivery |
ST5 |
Colchester’s Housing Need |
|
SG3 |
Economic Growth Provision |
ST6 |
Colchester’s Employment Need |
|
SG4 |
Local Economic Areas |
E1 PEP1-PEP16 |
Protection of Employment |
|
SG5 |
Centre Hierarchy |
E4 |
Retail and Centres |
|
SG6 |
Town Centre Uses |
E4 |
Retail and Centres |
|
SG6a |
Local Centres |
E4 |
Retail and Centres |
|
SG7 |
Infrastructure Delivery and Impact Mitigation |
ST7 ST7a |
Infrastructure Delivery and Impact Mitigation |
|
SG8 |
Neighbourhood Plan |
Place policies |
Neighbourhood plans are referred to in relevant Place policies |
|
ENV1 |
Environment |
ST2 EN1 EN2 EN3 EN4 |
Environment and the Green Network Nature conservation designated sites Biodiversity net gain (BNG) and environmental net gain Biodiversity and geodiversity Irreplaceable habitats |
|
ENV2 |
Coastal Areas |
LC3 |
Coastal areas |
|
ENV3 |
Green Infrastructure |
GN1 |
Green Network and Waterways Principles |
|
ENV4 |
Dedham Vale Area of Outstanding Natural Beauty |
LC2 |
Dedham Vale National Landscape |
|
ENV5 |
Pollution and Contaminated Land |
EN9 |
Pollution and Contaminated Land |
|
CC1 |
Climate Change |
NZ1 GN4 |
Net Zero Carbon Development (in operation) Tree Canopy Cover |
|
PP1 |
Generic Infrastructure and Mitigation Requirements |
ST7 |
Infrastructure Delivery and Impact Mitigation |
|
TC1 |
Town Centre Policy and Hierarchy |
E4 |
Retail and Centres |
|
TC2 |
Retail Frontages |
E4 |
Retail and Centres |
|
EC1 |
Knowledge gateway and University of Essex Strategic Economic Area |
PEP2 UE1 |
Knowledge Gateway University of Essex |
|
WC3 |
Colchester Zoo |
E5 |
Colchester Zoo |
|
SS12b |
Coast Road West Mersea |
LC3 |
Coastal Areas |
|
SS12c |
Mersea Island Caravan Parks |
CS6 |
Caravan Parks |
|
OV1 |
Development in Other Villages |
ST3 |
Spatial Strategy |
|
OV2 |
Countryside |
ST4 |
Development in the Countryside |
|
DM1 |
Health and Wellbeing |
ST1 PC1 |
Health and Wellbeing Healthier Food Environments |
|
DM2 |
Community Facilities |
CS1 CS2 PC9 |
Retention of Community Facilities Enhancement and Provision for new Community Facilities |
|
DM3 |
Education Provision |
CS3 |
Education Provision |
|
DM4 |
Sports Provision |
CS4 |
Sports Provision |
|
DM5 |
Tourism, leisure, Culture and Heritage |
CS5 |
Tourism, Leisure, Arts, Culture and Heritage |
|
DM6 |
Economic Development in Rural Areas and the Countryside |
E2 |
Economic Development in Rural Areas and the Countryside |
|
DM7 |
Agricultural Development and Diversification |
E3 |
Agricultural Development and Diversification |
|
DM8 |
Affordable Housing |
H2 |
Affordable Housing |
|
DM9 |
Development Density |
PC4 |
Development Density |
|
DM10 |
Housing Diversity |
H3 H4 H5 H6 |
Student Accommodation Houses in Multiple Occupation (HMOs) Specialist Housing including Housing for an Aging Population Self and Custom Build |
|
DM11 |
Gypsies, Travellers and Travelling Showpeople |
H7 |
Gypsies, Travellers and Travelling Showpeople |
|
DM12 |
Housing Standards |
PC6 H5 |
Design and Amenity Specialist Housing including housing for an aging population |
|
DM13 |
Domestic Development |
PC5 |
Domestic Development |
|
DM14 |
Rural Workers Dwellings |
H8 |
Rural Workers Dwellings |
|
DM15 |
Design and Amenity |
PC6 |
Design and Amenity |
|
DM16 |
Historic Environment |
EN6 EN7 |
Conserving and Enhancing the Historic Environment Archaeology |
|
DM17 |
Retention of Open Space |
GN6 |
Retention of Open Space |
|
DM18 |
Provision of Open Space and Recreation Facilities |
GN1 |
Green network and waterways principles |
|
DM19 |
Private Amenity Space |
PC8 |
Private amenity space |
|
DM20 |
Promoting Sustainable Transport and Changing Travel Behaviour |
PC2 ST7a |
Active and Sustainable Travel |
|
DM21 |
Sustainable Access to development |
PC2 |
Active and Sustainable Travel |
|
DM22 |
Parking |
PC3 |
Parking Standards |
|
DM23 |
Flood Risk and Water Management |
EN8 |
Flood Risk and Sustainable Drainage Systems (SuDS) |
|
DM24 |
Sustainable Urban Drainage Systems |
EN8 |
Flood Risk and Sustainable Drainage Systems (SuDS) |
|
DM25 |
Renewable Energy, Water Waste and Recycling |
NZ4 NZ3 |
Renewable Energy Wastewater and Water Supply |
|
Place Policies |
Place Policies PP1-PP55; OA1-OA5 |
||
Policy SP 8 Development & Delivery of a New Garden Community in North Essex Comment
The following new garden community is proposed at the broad location shown on Map 10.2.
Tendring/Colchester Borders, a new garden community which will deliver between 2,200 and 2,500 homes, 7 hectares of employment land and provision for Gypsies and Travellers within the Plan period (as part of an expected overall total of between 7,000 and 9,000 homes and 25 hectares of employment land to be delivered beyond 2033).
The garden community will be holistically and comprehensively planned with a distinct identity that responds directly to its context and is of sufficient scale to incorporate a range of homes, employment, education & community facilities, green space and other uses to enable residents to meet the majority of their day-to-day needs, reducing the need for outward commuting. It will be comprehensively planned from the outset, with delivery phased to achieve the whole development, and will be underpinned by a comprehensive package of infrastructure.
A Development Plan Document (DPD) will be prepared for the garden community, containing policies setting out how the new community will be designed, developed and delivered in phases, in accordance with the principles in paragraphs i-xiv below. No planning consent for development forming part of the garden community will be granted until the DPD has been adopted. All development forming part of the garden community will comply with these principles.
i. Community and stakeholder participation in the design and delivery of the garden community from the outset and a long-term community engagement and activation strategy.
ii. The public sector working pro-actively and collaboratively with the private sector to design, and bring forward the garden community, deploying new models of delivery where appropriate and ensuring that the cost of achieving the following is borne by landowners and those promoting the developments: (a) securing a high-quality of place-making, (b) ensuring the timely delivery of both on-site and off-site infrastructure required to address the impact of the new community, and (c) providing and funding a mechanism for future stewardship, management, maintenance and renewal of community infrastructure and assets. Where appropriate, developers will be expected to contribute towards publicly-funded infrastructure, including a contribution towards the A120-A133 link road. Given the scale of and time period for development of the new garden community, the appropriate model of delivery will need to secure a comprehensive approach to delivery in order to achieve the outcomes outlined in points (a) - (c) in this paragraph, avoid a piecemeal approach to development, provide the funding and phasing of both development and infrastructure, and be sustainable and accountable in the long term.
iii. Promotion and execution of the highest quality of planning, design and management of the built and public realm so that the Garden Community is characterised as a distinctive place that capitalises on local assets, respects its context,and establishes an environment that promotes health, happiness and well-being.
iv. Sequencing of development and infrastructure provision (both on-site and off-site) to ensure that the latter is provided ahead of or in tandem with the development it supports to address the impacts of the new garden community, meet the needs of its residents and establish sustainable travel patterns. To ensure new development does not have an adverse effect on any European Protected or nationally important sites and complies with environmental legislation (notably the Water Framework Directive and the Habitats Directive), the required waste water treatment capacity must be available ahead of the occupation of dwellings.
v. Development that provides for a truly balanced and inclusive community and meets the housing needs of local people including a mix of dwelling sizes, tenures and types, provision for self- and custom-built homes, provision for the aging population; and provision for Gypsies and Travellers; and that meets the requirements of those most in need including the provision of 30% affordable housing in the garden community.
vi. Provide and promote opportunities for employment within the new community and within sustainable commuting distance of it.
vii. Plan the new community around a step change in integrated and sustainable transport systems for the North Essex area that put walking, cycling and rapid public transit networks and connections at the heart of growth in the area, encouraging and incentivising more sustainable active travel patterns.
viii. Structure the new community to create sociable, vibrant and walkable neighbourhoods with equality of access for all to a range of community services and facilities including health, education, retail, culture, community meeting spaces, multi-functional open space, sports and leisure facilities.
ix. Develop specific garden community parking approaches and standards that help promote the use of sustainable transport and make efficient use of land.
x. Create distinctive environments which are based on comprehensive assessments of the surrounding environment and that celebrate natural and historic environments and systems, utilise a multi-functional green-grid to create significant networks of new green infrastructure including a new country park at the garden community, provide a high degree of connectivity to existing corridors and networks and enhance biodiversity.
xi. Secure a smart and sustainable approach that fosters climate resilience and a 21st century environment in the design and construction of the garden community to secure net gains in local biodiversity, highest standards of energy efficiency and innovation in technology to reduce the impact of climate change, the incorporation of innovative water efficiency/re-use measures (with the aim of being water neutral in areas of serious water stress), and sustainable waste and mineral management.
xii. Ensure that the costs and benefits of developing a garden community are shared by all landowners, with appropriate measures being put in place to equalise the costs and land contributions.
xiii. Consideration of potential on-site mineral resources through a Minerals Resource Assessment as required by the Minerals Planning Authority.
xiv. Establishment at an early stage in the development of the garden community, of appropriate and sustainable long-term governance and stewardship arrangements for community assets including green space, public realm areas and community and other relevant facilities; such arrangements to be funded by the development and include community representation to ensure residents have a stake in the long term development, stewardship and management of their community.
Policy SP 9 Tendring/Colchester Borders Garden Community
The Development Plan Document (DPD) required for the Tendring / Colchester Borders Garden Community by Policy SP8 will define the boundary of the new community and the amount of development it will contain. The adoption of the DPD will be contingent on the completion of a Heritage Impact Assessment carried out in accordance with Historic England guidance. The Heritage Impact Assessment will assess the impact of proposed allocations upon the historic environment, inform the appropriate extent and capacity of the development and establish any mitigation measures necessary. The DPD will be produced in consultation with the local community and stakeholders and will include a concept plan showing the disposition and quantity of future land-uses, and give a three dimensional indication of the urban design and landscape parameters which will be incorporated into any future planning applications; together with a phasing and implementation strategy which sets out how the rate of development will be linked to the provision of the necessary social, physical and environmental infrastructure to ensure that the respective phases of the development do not come forward until the necessary infrastructure has been secured. The DPD and any application for planning permission for development forming part of the garden community must be consistent with the requirements set out in this policy.
For the Plan period up to 2033, housing delivery from the garden community, irrespective of its actual location, will be distributed equally between Colchester Borough Council and Tendring District Council. If, after taking into account its share of delivery from the garden community, either of those authorities has a shortfall in delivery against the housing requirement for its area, it will need to make up the shortfall within its own area. It may not use the other authority’s share of delivery from the garden community to make up the shortfall.
The DPD and any planning application will address the following principles and requirements in the design, development and delivery of the new garden community:
A. Place-Making and Design Quality
1. The development of a new garden community to high standards of design and layout drawing on its context and the considerable assets within its boundaries such as woodland, streams and changes in topography, as well as the opportunities afforded by the proximity of the University of Essex campus to create a new garden community that is innovative, contemporary and technologically enabled, set within a strong green framework with new neighbourhood centres at its heart. It will be designed and developed to have its own identity and be as self-sustaining as possible recognising its location close to the edge of Colchester. It will secure appropriate integration with Colchester and the nearby University of Essex campus by the provision of suitable walking and cycling links and rapid public transport systems and connections to enable residents of the new community to have convenient access to town centre services and facilities in Colchester as well as Elmstead Market. Clear separation will be maintained between the new garden community and the nearby villages of Elmstead Market and Wivenhoe. Safeguarding the important green edge to Colchester will be essential with a new country park provided along the Salary Brook corridor and incorporating Churn Wood.
2. Detailed masterplans and design guidance, based on a robust assessment of historic and natural environmental constraints and opportunities for enhancement, will be adopted to inform and guide development proposals and planning applications for the garden community.
B. Housing
3. A mix of housing types and tenures including self- and custom-build and starter homes will be provided on the site, including a minimum of 30% affordable housing. The affordable housing will be phased through the development.
4. New residential development will seek to achieve appropriate densities which reflect both context, place-making aspirations and opportunities for increased levels of development around neighbourhood centres and transport hubs.
C. Employment and Jobs
5. The garden community will make provision for a wide range of jobs, skills and training opportunities.The DPD will allocate about 25 hectares of B use employment land within the garden community. This may include provision for office, research & development, light industrial and/or other employment generating uses towards the south of the site in proximity to the existing University of Essex and Knowledge Gateway and provision for office, research & development, industrial, storage and distribution uses towards the north of the site close to the A120.
6. High speed and reliable broadband will be provided and homes will include specific spaces to enable working from home.
D. Transportation
7. A package of measures will be introduced to encourage smarter transport choices to meet the needs of the new community and to maximise the opportunities for sustainable travel. Policy SP6 requires planning consent and full funding approval for the A120-A133 link road and Route 1 of the rapid transit system to have been secured before planning approval is granted for any development at the garden community. Additional transport priorities include the provision of a network of footpaths, cycleways and bridleways to enhance permeability within the site and to access and to access the adjoining areas; park and ride facilities and other effective integrated measures to mitigate the transport impacts of the proposed development on the strategic and local road network. Longer term transport interventions will need to be carefully designed to minimise the impacts on the strategic and local transport network and fully mitigate any environmental or traffic impacts arising from the development.
8. Foot and cycle ways shall be provided throughout the development and connecting with the surrounding urban areas and countryside, including seamlessly linking key development areas to the University of Essex, Hythe station and Colchester Town Centre.
9. Primary vehicular access to the site will be provided off the A120 and A133. Any other road improvements required to meet needs arising from the garden community will be set out in the DPD and further defined as part of the masterplanning process.
10. Other specific transport-related infrastructure requirements identified through the Strategic Growth Development Plan Document and masterplans for this garden community will be delivered in a phased manner.
E. Community Infrastructure
11. District and neighbourhood centres of an appropriate scale will be provided to serve the proposed development. The centres will be located where they will be easily accessible by walking, cycling and public transit to the majority of residents in the garden community.
12. Community meeting places will be provided within the local centres.
13. Increased primary healthcare capacity will be provided to serve the new development as appropriate. This may be by means of new infrastructure or improvement, reconfiguration, extension or relocation of existing medical facilities.
14. A secondary school, primary schools and early-years facilities will be provided to serve the new development.
15. A network of multi-functional green infrastructure will be provided within the garden community incorporating key elements of the existing green assets within the site. It will include community parks, allotments, a new country park, the provision of sports areas with associated facilities; and play facilities.
16. Indoor leisure and sports facilities will be provided within the new community, or contributions made to the improvement of off-site leisure facilities to serve the new development.
F. Other Requirements
17. The delivery of smart, innovative and sustainable water efficiency/re-use solutions that fosters climate resilience and a 21st century approach towards water supply, water and waste water treatment and flood risk management. Taking a strategic approach to flood risk through the use of Strategic Flood Risk Assessments and the updated Climate Projections 2019 and identifying opportunities for Natural Flood Risk Management. Provision of improvements to waste water treatment plant including an upgrade to the Colchester Waste Water Treatment Plan and off-site drainage improvements aligned with the phasing of the development within the plan period and that proposed post 2033. To ensure new development does not have an adverse effect on any European Protected or nationally important site and complies with environmental legislation (notably the Water Framework Directive and the Habitats Directive), the required waste water treatment capacity must be available ahead of the occupation of dwellings.
18. Landscape buffers between the site and existing development in Colchester, Wivenhoe and Elmstead Market.
19. Conserve and where appropriate enhance the significance of heritage assets (including any contribution made by their settings) both within and surrounding the site. Designated heritage assets within the garden community area include Grade II listed Allen’s Farmhouse, Ivy Cottage, Lamberts, and three buildings at Hill farmhouse. Designated heritage assets nearby include the grade I listed Church of St Anne and St Lawrence, grade II* listed Wivenhoe House, Elmstead Hall and Spring Valley Mill and numerous grade II listed buildings as well as the grade II listed Wivenhoe Registered Park and Garden. Harm to the significance of a designated heritage asset should be avoided in the first instance.
20. Avoidance,protection and/or enhancement of biodiversity assets within and surrounding the site; including Bullock Wood SSSI, Ardleigh Gravel Pits SSSI, Wivenhoe Pits SSSI and Upper Colne Marshes SSSI and relevant European protected sites. Contributions will be secured towards mitigation measures in accordance with the Essex Coast Recreational disturbance Avoidance and Mitigation Strategy. Wintering bird surveys will be undertaken at the appropriate time of year as part of the DPD preparation to identify any offsite functional habitat. Should any be identified, development must firstly avoid impacts. Where this is not possible, development must be phased to deliver habitat creation and management either on- or off-site to mitigate any significant impacts. Any such habitat must be provided and fully functional before any development takes place which would affect significant numbers of SPA birds.
21. Provision of appropriate buffers along strategic road and rail infrastructure to protect new development.
22. Provision of appropriate design and infrastructure that incorporates the highest standards of innovation in energy efficiency and technology to reduce impact of climate change, water efficiency (with the aim of being water neutral in areas of serious water stress), and sustainable waste / recycling management facilities.
23. Measures to support the development of the new community including provision of community development support workers (or other provision) for a minimum of ten years from initial occupation of the first homes and appropriate community governance structures.
24. Establishment at an early stage in the development of the garden community, of appropriate and sustainable long-term governance and stewardship arrangements for community assets including green space, public realm areas and community and other relevant facilities; such arrangements to be funded by the development and include community representation to ensure residents have a stake in the long term development, stewardship and management of their community.
25. Allocation of additional land within the garden community, to accommodate University expansion, which is at least equivalent in size to the allocation in the Colchester Local Development Framework Site Allocations document October 2010.
14.2The following Supplementary Planning Documents and Guidance are superseded:
- Colne Harbour Masterplan – January 2008
- Colne Harbour Design Framework – January 2001
- Colne Harbour Public Space Design Guide
- Essex County Hospital Development Brief – December 2014
- Stanway Railway Sidings Development Brief – April 2011
- Stanway Southern Sites Access Development Brief – December 2013
- Garrison Masterplan – November 2002
- Sustainable Drainage Systems Design Guide – December 2014
- Planning Guidance Note on Air Quality – August 2012
- Sustainable Construction SPD
14.3The following Supplementary Planning Documents and Guidance remain:
- Abro Development Brief - SPD
- Active Travel SPD
- Climate Change SPD
- Biodiversity SPD
- Affordable Housing SPD
- Backland and Infill SPD
- Essex Coast RAMS SPD
- North Colchester Growth Area SPD
- Provision of Community Facilities SPD
- Provision of Open Space, Sport and Recreational Facilities SPD
- Shopfront Design Guide SPD
- Street Services Delivery Strategy SPD
- Colchester City Centre Masterplan SPD
- Vehicle Parking Standards SPD – 2009
- Development and Public Rights of Way – Jan 2010
- Managing Archaeology in Development SPD – 2015
- External Materials Guide for New Development – July 2004
- Developing a Landscape for the Future – September 2013
- Magdalen Street Development Brief – February 2014
- Magdalen Street Sidings Development Brief – February 2014
- Planning for Broadband – February 2016
- Rural Workers Dwelling – Guidance Note for Applicants – August 2012
- Tollgate Vision July 2013