Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Search representations

Results for Essex County Council Spatial Planning search

New search New search

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy GN2: Strategic Green Spaces and Nature Recovery

Representation ID: 14437

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

ECC support the integration of Policy GN2 with the Essex LNRS and the focus on the Roman River corridor as a priority nature recovery area. To strengthen delivery, it is recommended requiring that development proposals within LNRS strategic habitat creation opportunity areas demonstrate a net positive contribution to LNRS priorities. In addition, the policy could reference the statutory biodiversity net gain metric uplift, whereby BNG delivered in locations of high strategic significance attracts a 1.15 multiplier, incentivising habitat creation in priority areas.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy GN3: Local Green Spaces

Representation ID: 14438

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

ECC welcome the inclusion of Policy GN3 designating Local Green Spaces, as this provides strong protection for areas of particular community value and ensures their long-term role in supporting wellbeing, biodiversity, and local character, in line with Neighbourhood Plans.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy GN6: Retention of Open Space

Representation ID: 14439

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

ECC supports Policy GN6 commitment to retaining, protecting, and enhancing existing open spaces and addressing deficiencies. To maximise the benefits of any new or replacement provision, we recommend that all new open spaces are designed to be multipurpose, delivering not only recreation but also biodiversity, climate resilience, and sustainable drainage functions in line with Essex Green Infrastructure Standards. This approach ensures that open spaces contribute to the wider green network, provide amenity value, and support nature recovery while meeting community needs. Clear guidance on multifunctional design within the policy or technical appendix would help secure these outcomes consistently.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy PC6: Design and Amenity

Representation ID: 14440

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Officer summary:
Additional wording suggested to explicitly require SuDS, shade, and heat adaption in public realm.
ECC welcomes requirement for high standards of sustainability within the design and construction of buildings. This should be expanded to include the need for construction materials to be sustainably sourced, to ensure the maximum possible recycling of aggregates from construction, demolition and excavation wastes produced at development or redevelopment sites. This will align with the minerals and waste plans.
Omission. Digital connectivity for placemaking. There is no explicit requirement for full-fibre/5G-ready infrastructure in new developments. Additional wording recommended to Policy PC6 to reflect this.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy PC7: Residential Schemes on Greenfield Sites

Representation ID: 14441

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Wording recommended to Policy PC7 to strengthen support of sustainable modes. Suggest including text under design/layout principles.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy PP49: Land at St Ives Road, Peldon

Representation ID: 14442

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Land at St Ives Road Peldon, developer should adhere to the standards set out in the Sustainable Drainage Guide for Essex, discharge at the 1 in 1 greenfield rate and follow the drainage hierarchy. Where there may be areas of surface water ponding the drainage strategy should evidence how these will be managed.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy PP48: Kelvedon Road, Messing

Representation ID: 14443

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Kelvedon Road Messing, developer should adhere to the standards set out in the Sustainable Drainage Guide for Essex, discharge at the 1 in 1 greenfield rate and follow the drainage hierarchy.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy PP47: Land at Picketts Farm, Fingringhoe

Representation ID: 14444

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Land at Picketts Farm, this will potentially be a minor application.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy PP46: Land at Birch Green, Birch

Representation ID: 14445

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Land at Birch Green, developer should adhere to the standards set out in the Sustainable Drainage Guide for Essex, discharge at the 1 in 1 greenfield rate and follow the drainage hierarchy.

Attachments:

Comment

Colchester City Council Preferred Options Local Plan Regulation 18 Consultation 2025

Policy PP45: Land off New Road, Aldham

Representation ID: 14446

Received: 14/01/2026

Respondent: Essex County Council Spatial Planning

Representation Summary:

Land off New Road Aldham, developer should adhere to the standards set out in the Sustainable Drainage Guide for Essex, discharge at the 1in1 greenfield rate and follow the drainage hierarchy.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.